Project details
| Official title | Environment clearance of Proposed Integrated Manufacturing & Logistic Cluster –Gorakhpur over an area of 62.0952 Ha. at Village: Bahadurpur Khurd and Bahadurpur Buzurg, Tehsil Khajani, District – Gorakhpur, Uttar Pradesh by Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) |
|---|---|
| Status | Cleared for impact study |
| Status since | 13 Jan 2026 |
| Application filed | 8 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Uttar Pradesh Expressways Industrial Development Authority (Upeida) |
| Land area | 153.5 acres (62.1 ha) |
| Project cost | ₹146.2 crore |
| Village / locality | Bahadurpur Buzurg |
| Taluk / tehsil | Khajni |
| District | Gorakhpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03012 |
In context
14 applications in Gorakhpur since January 2022 are in the same category (Industry): 13 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 153.5 acres, this one is larger than 79% of them.
Where it is
Bahadurpur Buzurg, Khajni, Gorakhpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Standalone Cement Grinding unit with Cement Production Capacity of 2… — cleared for impact study, 15.8 km away
- 6867.66 acre (approx.) Industrial Corridor Dhuriyapar District Gorakhpur Uttar… — environmental approval granted, 15.8 km away
- 6867.66 acre (approx.) Industrial Corridor Dhuriyapar District Gorakhpur Uttar… — cleared for impact study, 15.8 km away
- PROPOSED GRAIN BASED ETHANOL DISTILLERY CAPACITY – 750 KLD AND MALT BASED… — environmental approval granted, 16.4 km away
- PROPOSED GRAIN BASED ETHANOL DISTILLERY CAPACITY – 750 KLD AND MALT BASED… — cleared for impact study, 16.4 km away
- "Riverbed Ordinary Sand mining" from Riverbed of Ghaghara River located at… — environmental approval granted, 18.2 km away
- "Riverbed Ordinary Sand mining" from Riverbed of Ghaghara River located at… — cleared for impact study, 18.2 km away
- Riverbed Sand Mining on the riverbed of Ghaghara River at Gata No. 62 Gha,… — under environmental review, 18.5 km away
All 39 Uttar Pradesh Expressways Industrial Development Authority (Upeida) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.