Project details
| Official title | Proposed Standalone Cement Grinding unit with Cement Production Capacity of 2 x 3.0 Million TPA (6.0 Million TPA) along with DG Set (2 X 1250KVA) and Hot Air Generator (HAG) at Village - Harpur, Block - Uruwa, Tehsil - Gola (Dhuriyapar Industrial Area, Sector - S-5), District Gorakhpur, Uttar Pradesh by Ambuja Concrete North Private Limited (ACNPL) |
|---|---|
| Status | Cleared for impact study |
| Status since | 28 Sept 2026 |
| Application filed | 30 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Ambuja Concrete North Private Limited |
| Land area | 46.6 acres (18.9 ha) |
| Project cost | ₹14 crore |
| Village / locality | Harpur |
| Taluk / tehsil | Gola |
| District | Gorakhpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04615 |
In context
14 applications in Gorakhpur since January 2022 are in the same category (Industry): 13 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 46.6 acres, this one is smaller than 64% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Harpur, Gola, Gorakhpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 6867.66 acre (approx.) Industrial Corridor Dhuriyapar District Gorakhpur Uttar… — environmental approval granted, 50 m away
- 6867.66 acre (approx.) Industrial Corridor Dhuriyapar District Gorakhpur Uttar… — cleared for impact study, 50 m away
- PROPOSED GRAIN BASED ETHANOL DISTILLERY CAPACITY – 750 KLD AND MALT BASED… — environmental approval granted, 650 m away
- PROPOSED GRAIN BASED ETHANOL DISTILLERY CAPACITY – 750 KLD AND MALT BASED… — cleared for impact study, 650 m away
- Riverbed Sand Mining on the riverbed of Ghaghara River at Gata No. 62 Gha,… — under environmental review, 10.3 km away
- "Riverbed Ordinary Sand mining" from Riverbed of Ghaghara River located at… — environmental approval granted, 10.6 km away
- "Riverbed Ordinary Sand mining" from Riverbed of Ghaghara River located at… — cleared for impact study, 10.6 km away
- Proposed Ordinary Sand Mining project from the riverbed of Ghaghara river at… — initial checks, 11.1 km away
All 19 Ambuja Concrete North projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.