Quick answers
What is "Bhutha Ordinary Sand Mine Riverbed of Rapti River"?
"Bhutha Ordinary Sand Mine Riverbed of Rapti River" is an approved mining project in Dingura Jot, Ikauna, Shrawasti, Uttar Pradesh. The site covers 11 acres.
Who is building it?
The applicant is Indu shukla.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Sept 2025), as of 27 Nov 2026.
Where is it?
In Dingura Jot, Ikauna, Shrawasti, Uttar Pradesh.
How big is it?
It has a stated cost of ₹44 lakh and a site of 11 acres.
When was it filed?
The application was filed on 14 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Sept 2025 |
| Application filed | 14 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Indu shukla |
| Land area | 11 acres (4.5 ha) |
| Project cost | ₹44 lakh |
| Village / locality | Dingura Jot |
| Taluk / tehsil | Ikauna |
| District | Shrawasti |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03036 |
In context
6 applications in Shrawasti since January 2022 are in the same category (Mining): 3 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected.
No other mining lease on record has applied within 5 km of this site.
Where it is
Dingura Jot, Ikauna, Shrawasti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Sand removal from Bhumidhari/ Agricultural land/Private land at Gata… — lapsed, 8.3 km away
- High-Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-II)… — more information requested, 22.4 km away
- Bharat Net — lapsed, 23.5 km away
- Project for Laying of Optical Fibre Cable (OFC) — under forest review, 24.4 km away
- CBWTF Facility ROYAL POLLUTION CONTROL SERVICES — cleared for impact study, 24.7 km away
- Proposed Forest land to be diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 28.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 29.5 km away
- Proposal for Tower construction under BOP/BIP Project at Tarusma BOP and… — more information requested, 31 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.