What is this project?
Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 339 (Khand No.- 16), Village- Daharra, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 0.809 ha.), Shri Keerti Dev Varman Singh Chandel S/o Shri Pushpendra Singh Chandel is a proposed mining project in Daharra, Mahoba, Uttar Pradesh. The site covers 2 acres.
Who is building it?
The applicant is Keerti Dev Varman Singh Chandel.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 10 Jun 2025), as of 27 Nov 2026.
Where is it?
In Daharra, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh and a site of 2 acres.
When was it filed?
The application was filed on 11 May 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 339 (Khand No.- 16),…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 10 Jun 2025 |
| Application filed | 11 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Keerti Dev Varman Singh Chandel |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹65 lakh |
| Village / locality | Daharra |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03044 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 26 Nov 2025 | Environmental approval granted | 2 acres | ₹65 lakh |
| Early planning filed 11 May 2025 (this page) | Cleared for impact study | 2 acres | ₹65 lakh |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2 acres, this one is smaller than 87% of them.
9 other mining leases have applied within 500 m of this site; together with this one they cover 29.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 37 mining leases have applied within 5 km.
Where it is
Daharra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 339 (Khand… — environmental approval granted, 0 m away
- Building stone (Granite-Khanda-Boulder-Ballast(Gitty))" Mine at Gata/Arazi… — environmental approval granted, 100 m away
- Building stone (Granite-Khanda-Boulder-Ballast(Gitty))" Mine at Gata/Arazi… — cleared for impact study, 100 m away
- Building Stone (Khanda,Gitti , Boulder) Mine — environmental approval granted, 250 m away
- Building Stone (Khanda,Gitti , Boulder) Mine — cleared for impact study, 250 m away
- "Building Stone or Granite Khanda, Boulder, Ballast (Gitty)" at Gata/Arazi No-… — under environmental review, 350 m away
- "Building Stone or Granite Khanda, Boulder, Ballast (Gitty)" at Gata/Arazi No-… — cleared for impact study, 350 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 350 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.