What is Developing? Open the mapMap

Cleared for impact studyMining · Jalaun, Uttar Pradesh

"Sand/Morrum Mining" from Riverbed of Betwa River

"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Pathrehta, Kalpi, Jalaun, Uttar Pradesh. The site covers 40 acres. Its stated project cost is ₹1.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 12 Jun 2026).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Sand/Morrum Mining" from Riverbed of Betwa River?

"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Pathrehta, Kalpi, Jalaun, Uttar Pradesh. The site covers 40 acres.

Who is building it?

The applicant is Parihar Construction.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 12 Jun 2026), as of 27 Nov 2026.

Where is it?

In Pathrehta, Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.2 crore and a site of 40 acres.

When was it filed?

The application was filed on 23 Sept 2025.

Project details

Official title"Sand/Morrum Mining" from Riverbed of Betwa River at Village- Pathretha, Gata No.- 747, Khand No.- 05, Lease Area- 16.195 Ha., Tehsil- Kalpi, District- Jalaun, Uttar Pradesh, Project Proponent- M/s Parihar Construction (Partner- Shri Balwant Singh)
StatusCleared for impact study
Status since12 Jun 2026
Application filed23 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantParihar Construction
Land area40 acres (16.2 ha)
Project cost₹1.2 crore
Village / localityPathrehta
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03087

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 29 Jun 2026Under environmental review40 acres₹1.2 crore
Early planning filed 23 Sept 2025 (this page)Cleared for impact study40 acres₹1.2 crore

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 40 acres, this one is larger than 52% of them.

No other mining lease on record is within 500 m of this site; 26 have applied within 5 km.

Where it is

Pathrehta, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Parihar Construction in Jalaun

4 Parihar Construction projects in Jalaun
All 29 Parihar Construction projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.