Quick answers
What is "Sand/Morrum Mining" from Riverbed of Betwa River?
"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Pathrehta, Kalpi, Jalaun, Uttar Pradesh. The site covers 40 acres.
Who is building it?
The applicant is Parihar Construction.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Pathrehta, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 40 acres.
When was it filed?
The application was filed on 29 Jun 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Betwa River
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Betwa River at Village- Pathretha, Gata No.- 747, Khand No.- 05, Lease Area- 16.195 Ha., Tehsil- Kalpi, District- Jalaun, Uttar Pradesh, Project Proponent- M/s Parihar Construction (Partner- Shri Balwant Singh) |
|---|---|
| Status | Under environmental review |
| Status since | 30 Oct 2026 |
| Application filed | 29 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Parihar Construction |
| Land area | 40 acres (16.2 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Pathrehta |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04144 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Jun 2026 (this page) | Under environmental review | 40 acres | ₹1.2 crore |
| Early planning filed 23 Sept 2025 | Cleared for impact study | 40 acres | ₹1.2 crore |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 40 acres, this one is larger than 52% of them.
No other mining lease on record is within 500 m of this site; 26 have applied within 5 km.
Where it is
Pathrehta, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 0 m away
- Proposed riverbed Sand / Morrum mining Area-16.195 Ha Project at Betwa River… — cleared for impact study, 650 m away
- Pathreta Sand/ Morrum Mine — environmental approval granted, 650 m away
- Pathreta Sand/ Morrum Mine — cleared for impact study, 650 m away
- Proposed riverbed Sand / Morrum mining Area-16.195 Ha Project at Betwa River… — cleared for impact study, 1.1 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa,… — lapsed, 1.7 km away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — cleared for impact study, 1.9 km away
- Riverbed Sand/Morrum Mining Project having lease area 16.1877 ha (40.00 acre)… — cleared for impact study, 2 km away
More from Parihar Construction in Jalaun
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — cleared for impact study
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 864/320, 865/320,… — under environmental review
4 Parihar Construction projects in Jalaun
All 29 Parihar Construction projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.