One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project for Cement Grinding Unit for Production of 2.5 MTPA by M/s Kanodia Cem…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 12 Oct 2026 |
| Application filed | 19 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Kanodia Cem Private Limited |
| Land area | 10.1 acres (4.1 ha) |
| Project cost | ₹472.7 crore |
| Village / locality | Samaspur |
| Taluk / tehsil | Khurja |
| District | Bulandshahr |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03171 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Dec 2025 (this page) | Under environmental review | 10.1 acres | ₹472.7 crore |
| Early planning filed 23 Oct 2024 | Cleared for impact study | 10.1 acres | ₹472.7 crore |
In context
10 applications in Bulandshahr since January 2022 are in the same category (Industry): 6 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 10.1 acres, this one is smaller than 80% of them.
Where it is
Samaspur, Khurja, Bulandshahr, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project for Cement Grinding Unit for Production of 2.5 MTPA by M/s… — cleared for impact study, 0 m away
- Power project by TP Jalpura Khurja Power Transmission Limited — forest land use approved, 5.6 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to Bio… — forest land use approved, 8.3 km away
- Proposed Forest Land to be diverted for two lane to four lane Widening and… — more information requested, 8.5 km away
- Proposed Protected Forest Land to be diverted for Construction of Approach… — lapsed, 8.7 km away
- Diversion of 0.0339 Hectare of Protected Forest land Under Social Forestry… — forest land use approved, 9.5 km away
- Proposed Protected Forest Land to be diverted for laying of gas pipeline along… — more information requested, 12.5 km away
- Project for Laying of Carbon Steel Gas Pipeline by Indian Oil-Adani Gas… — more information requested, 13 km away
All 4 Kanodia Cem projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.