Project details
| Official title | Proposed Protected Forest Land to be diverted for Construction of Approach Road to connect Kirra Industrial Township to NH-34 (G.T. Road) in Khurja, in District: Bulandshahr. |
|---|---|
| Status | Lapsed |
| Status since | 18 Sept 2025 |
| Application filed | 3 Feb 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bulandshahr Khurja Development Authority |
| Land area | 91.4 acres (37 ha) |
| Forest land | 360 m² |
| Project cost | ₹15.4 crore |
| Village / locality | Kirra |
| Taluk / tehsil | Khurja |
| District | Bulandshahr |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05958 |
In context
17 applications in Bulandshahr since January 2022 are in the same category (Roads & highways): 2 approved, 10 filed or under review, and 5 withdrawn, lapsed or rejected. At 91.4 acres, this one is larger than 82% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kirra, Khurja, Bulandshahr, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed protected forest land to be diverted for Entry/Exit approach to Bio… — forest land use approved, 1.8 km away
- Proposed Forest Land to be diverted for two lane to four lane Widening and… — more information requested, 5.6 km away
- Project for Laying of Carbon Steel Gas Pipeline by Indian Oil-Adani Gas… — more information requested, 6.4 km away
- Diversion of 0.0339 Hectare of Protected Forest land Under Social Forestry… — forest land use approved, 8 km away
- Proposed Project for Cement Grinding Unit for Production of 2.5 MTPA by M/s… — under environmental review, 8.7 km away
- Proposed Project for Cement Grinding Unit for Production of 2.5 MTPA by M/s… — cleared for impact study, 8.7 km away
- Proposed Forest Land to be diverted for Entry/Exit approach to Private… — more information requested, 9.2 km away
- Project for Forest Clearence:- लोक निर्माण विभाग ,प्रांतीय डिवीजन ,बुलंदशहर… — lapsed, 9.3 km away
More from Bulandshahr Khurja Development Authority in Bulandshahr
- Proposed Forest Land to be diverted for Construction of Approach Road in… — more information requested
- Proposed Forest Land to be diverted for Widening and Strengthening of Maharana… — more information requested
All 3 Bulandshahr Khurja Development Authority projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.