Project details
| Official title | Proposed Forest Land to be diverted for two lane to four lane Widening and Strengthening of Delhi-Kanpur Road (Old NH-91) O.D.R, in District: Bulandshahr. |
|---|---|
| Status | More information requested |
| Status since | 8 Sept 2025 |
| Application filed | 25 Feb 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Construction Divison Pwd Khurja |
| Land area | 8 acres (3.2 ha) |
| Forest land | 8 acres (3.2 ha) |
| Project cost | ₹24.3 crore |
| Village / locality | Hazratpur |
| Taluk / tehsil | Khurja |
| District | Bulandshahr |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07214 |
In context
17 applications in Bulandshahr since January 2022 are in the same category (Roads & highways): 2 approved, 10 filed or under review, and 5 withdrawn, lapsed or rejected. At 8 acres, this one is larger than 59% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hazratpur, Khurja, Bulandshahr, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0339 Hectare of Protected Forest land Under Social Forestry… — forest land use approved, 2.4 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to Bio… — forest land use approved, 3.8 km away
- Proposed Protected Forest Land to be diverted for Construction of Approach… — lapsed, 5.6 km away
- Proposed Protected Forest Land to be diverted for laying of gas pipeline along… — more information requested, 6.3 km away
- Proposed Project for Cement Grinding Unit for Production of 2.5 MTPA by M/s… — under environmental review, 8.5 km away
- Proposed Project for Cement Grinding Unit for Production of 2.5 MTPA by M/s… — cleared for impact study, 8.5 km away
- Khurja Super Thermal Power Project Stage-II (1*800 MW) — lapsed, 11.1 km away
- Khurja Super Thermal Power Project — lapsed, 11.1 km away
More from Executive Engineer Construction Divison Pwd Khurja in Bulandshahr
- Diversion of Forest Land for "Widening & up-gradation of Anupshahar–Shikarpur… — under forest review
- Proposed Reserved Forest Land to Be Diverted for Construction of… — initial checks
All 3 Executive Engineer Construction, Uttar Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.