Quick answers
What is this project?
Proposed project of Ordinary Sand Mining project at Gata No.- 592/1, Area- 5.0 ha, Village- Gahiya, Tehsil- Sadar, District- Mirzapur (U.P.) by M/s Mahadev Mining is an approved mining project in Gahia, Mirzapur, Uttar Pradesh. The site covers 12.4 acres.
Who is building it?
The applicant is Mithilesh singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 May 2025), as of 27 Nov 2026.
Where is it?
In Gahia, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 12.4 acres.
When was it filed?
The application was filed on 8 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 May 2025 |
| Application filed | 8 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mithilesh singh |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Gahia |
| Taluk / tehsil | Mirzapur |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03230 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 12.4 acres, this one is larger than 95% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Gahia, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" Project at Gata No.- 494 Ga/1, Village- Baisukiya,… — environmental approval granted, 5.6 km away
- "Ordinary Sand Mining" Project at Gata No.- 494 Ga/1, Village- Baisukiya,… — cleared for impact study, 5.6 km away
- Building Stone Gitti/ Boulder (Sand Stone), Mine Araji number-2260, Area-… — environmental approval granted, 8.5 km away
- Proposed Reserved Forest to be diverted for construction of 4 lane Mirzapur… — forest land use approved, 9 km away
- Proposed forest land to be diverted for Establishment of GAIL Gas Limited… — initial checks, 10.3 km away
- Proposed Forest Land to be diverted for Beautification Work of Temple — more information requested, 11.1 km away
- Proposed Forest Land to be diverted for Work of Tourism Infrastructure… — in-principle approval, conditions pending, 12.1 km away
- "Imarati Patthar (Sandstone)" Mine, Village- Dashwant Singh Ka Purwa,… — environmental approval granted, 14.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.