Quick answers
What is "Sand/Morrum Mining" from Riverbed of Betwa River?
"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Kalauli Teer Daria, Hamirpur, Uttar Pradesh. The site covers 40 acres.
Who is building it?
The applicant is Anandeshwar Agroventure Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kalauli Teer Daria, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 40 acres.
When was it filed?
The application was filed on 30 Sept 2025.
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Betwa River at Village- Kalauliteer Dariya, Bardaha Sahjana, Badanpur, Khand No. 16/2 (Kalauliteer Dariya, Gata No. 1, 2, 3, 4, 5, 6, 7, 35/42; Bardaha Sahjana- Gata No. 01/1, 02/11; Badanpur, Gata No. 206,) Lease Area- 16.194 Ha. (39.99 Acres), Tehsil- Hamirpur, District- Hamirpur, Uttar Pradesh, Project Proponent- M/s Anandeshwar Agroventure Pvt. Ltd. (Director- Shri Utsav Gupta) |
|---|---|
| Status | Under environmental review |
| Status since | 4 Sept 2026 |
| Application filed | 30 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Anandeshwar Agroventure Private Limited |
| Land area | 40 acres (16.2 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Kalauli Teer Daria |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03322 |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 40 acres, this one is smaller than 67% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Kalauli Teer Daria, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — more information requested, 1.6 km away
- Proposed Forest Land to be diverted for New Construction of Road — more information requested, 2 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 2.9 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 3.2 km away
- Construction of 200 Bedded Hospital and Trauma Center — environmental approval granted, 5.6 km away
- Construction of 200 Bedded Hospital and Trauma Center — returned to applicant, 5.6 km away
- "Development of Economic Corridors, Inter Corridors and Feeder Routes to… — under forest review, 7.8 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — more information requested, 8.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.