Quick answers
What is this project?
Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail Outlet is a proposed fuel station in Helapur Danda, Hamirpur, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Helapur Danda, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹55 lakh; a site of 0.8 acres and 2,140 m² of forest land.
When was it filed?
The application was filed on 12 Aug 2025.
Project details
| Official title | Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail Outlet at Village:- Helapur Danda, Tehsil:- Hamirpur, District:-Hamirpur. |
|---|---|
| Status | More information requested |
| Status since | 24 Dec 2025 |
| Application filed | 12 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 3,400 m² |
| Forest land | 2,140 m² |
| Project cost | ₹55 lakh |
| Village / locality | Helapur Danda |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06342 |
In context
13 applications in Hamirpur since January 2022 are in the same category (Fuel stations): 5 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.8 acres, this one is smaller than 69% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Helapur Danda, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 1.6 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 1.7 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 2.1 km away
- Proposed Forest Land to be diverted for New Construction of Road — more information requested, 3.3 km away
- Construction of 200 Bedded Hospital and Trauma Center — environmental approval granted, 6.9 km away
- Construction of 200 Bedded Hospital and Trauma Center — returned to applicant, 6.9 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — more information requested, 7 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 7 km away
More from Indian Oil Corporation Limited (IOCL) in Hamirpur
- Proposed Forest land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — more information requested
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
7 Indian Oil Corporation (IOCL) projects in Hamirpur
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.