Proposed Forest Land to be diverted for New Construction of Road is a proposed road project in Manjhoopur Danda, Hamirpur, Uttar Pradesh. The site covers 3.8 acres.
Who is building it?
The applicant is Provincial Division Pwd Hamirpur.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Manjhoopur Danda, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.8 crore; a site of 3.8 acres and 2.5 acres (1 ha) of forest land.
When was it filed?
The application was filed on 22 Sept 2026.
Project details
| Official title | Proposed Forest Land to be diverted for New Construction of Road, in District: Hamirpur (Uttar Pradesh) |
|---|---|
| Status | More information requested |
| Status since | 31 Oct 2026 |
| Application filed | 22 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Provincial Division Pwd Hamirpur |
| Land area | 3.8 acres (1.5 ha) |
| Forest land | 2.5 acres (1 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Manjhoopur Danda |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05482 |
In context
15 applications in Hamirpur since January 2022 are in the same category (Roads & highways): 1 approved, 9 filed or under review, and 5 withdrawn, lapsed or rejected. At 3.8 acres, this one is larger than 50% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Manjhoopur Danda, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 2 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — more information requested, 3.3 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 3.8 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 3.9 km away
- Construction of 200 Bedded Hospital and Trauma Center — environmental approval granted, 6.1 km away
- Construction of 200 Bedded Hospital and Trauma Center — returned to applicant, 6.1 km away
- "Development of Economic Corridors, Inter Corridors and Feeder Routes to… — under forest review, 6.2 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — more information requested, 10.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.