Quick answers
What is this project?
Proposed Project of Sand/Morrum Mining from Riverbed of Yamuna River at Gata No- 2/4, 2/23, 2/24, 2/28 , Khand No.-01, Area- 21.00 ha (51.89 Acre), Village- Bendakhadar, Tehsil & District- Banda, Uttar Pradesh of M/s Kamtanath Exploration Private Limited, Director Smt. Sandhya Devi is a proposed mining project in Khagaiyatal, Banda, Uttar Pradesh. The site covers 51.9 acres.
Who is building it?
The applicant is Sandhya Devi.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Khagaiyatal, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹42 lakh and a site of 51.9 acres.
When was it filed?
The application was filed on 4 Sept 2025.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 11 Jun 2026 |
| Application filed | 4 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sandhya Devi |
| Land area | 51.9 acres (21 ha) |
| Project cost | ₹42 lakh |
| Village / locality | Khagaiyatal |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03370 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 51.9 acres, this one is larger than 77% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Khagaiyatal, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 650 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — cleared for impact study, 650 m away
- Proposed riverbed sand/morrum mining project from Yamuna River of M/s Anmol… — under environmental review, 1.3 km away
- Proposed Project of "Sand/Morrum Mine" Gata No.- 2/4,2/23,2/24&2/28 (Khand… — under environmental review, 1.9 km away
- Proposed Project "Sand/Morrum Mining" at Gata No. Part of 6/2 (Khand-1), area-… — under environmental review, 2.4 km away
- Proposed Project "Sand/Morrum Mining" at Gata No. Part of 6/2 (Khand-2), area-… — under environmental review, 2.8 km away
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Yamuna River at… — under environmental review, 3.1 km away
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Yamuna River at… — cleared for impact study, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.