Quick answers
What is "Sand/Morrum Mining" from Riverbed of Yamuna River?
"Sand/Morrum Mining" from Riverbed of Yamuna River is a proposed mining project in Khagaiyatal, Banda, Uttar Pradesh. The site covers 51.9 acres.
Who is building it?
The applicant is Sarita Bhimsaria.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 May 2025), as of 27 Nov 2026.
Where is it?
In Khagaiyatal, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 51.9 acres.
When was it filed?
The application was filed on 29 Jan 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Yamuna River
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Yamuna River at Village-Bendakhadar, Gata No.- 2/4, 2/23, 2/24, & 2/28 (Khand No.-02), Lease Area- 21.0 Ha., Tehsil– Banda, District– Banda, Uttar Pradesh, Project Proponent- M/s S. B. Catering Service (Prop.- Smt Sarita Bhim Saria) |
|---|---|
| Status | Cleared for impact study |
| Status since | 29 May 2025 |
| Application filed | 29 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sarita Bhimsaria |
| Land area | 51.9 acres (21 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Khagaiyatal |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02585 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Jan 2026 | Environmental approval granted | 51.9 acres | ₹1.5 crore |
| Early planning filed 29 Jan 2025 (this page) | Cleared for impact study | 51.9 acres | ₹1.5 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 51.9 acres, this one is larger than 77% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Khagaiyatal, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 0 m away
- Proposed riverbed sand/morrum mining project from Yamuna River of M/s Anmol… — under environmental review, 650 m away
- Proposed Project of Sand/Morrum Mining from Riverbed of Yamuna River at Gata… — under environmental review, 650 m away
- Proposed Project of "Sand/Morrum Mine" Gata No.- 2/4,2/23,2/24&2/28 (Khand… — under environmental review, 1.2 km away
- Proposed Project "Sand/Morrum Mining" at Gata No. Part of 6/2 (Khand-1), area-… — under environmental review, 1.8 km away
- Proposed Project "Sand/Morrum Mining" at Gata No. Part of 6/2 (Khand-2), area-… — under environmental review, 2.1 km away
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Yamuna River at… — under environmental review, 2.4 km away
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Yamuna River at… — cleared for impact study, 2.4 km away
More from Sarita Bhimsaria in Banda
- Proposed riverbed sand/morrum mining project from Yamuna River of S.V.… — environmental approval granted
- Proposed riverbed sand/morrum mining project from Yamuna River of S.V.… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.