Quick answers
What is this project?
Proposed Project of riverbed "Ordinary Sand Mining" on the riverbed of Ghaghara River at Gata No. 87 MI, over an area of 2.298 Hectares is an approved mining project in Raipura Chacklal, Barhaj, Deoria, Uttar Pradesh. The site covers 5.7 acres.
Who is building it?
The applicant is Shri Krishna Bahadur Rao.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Jun 2025), as of 27 Nov 2026.
Where is it?
In Raipura Chacklal, Barhaj, Deoria, Uttar Pradesh.
How big is it?
It has a stated cost of ₹85 lakh and a site of 5.7 acres.
When was it filed?
The application was filed on 27 Apr 2025.
Project details
| Official title | Proposed Project of riverbed "Ordinary Sand Mining" on the riverbed of Ghaghara River at Gata No. 87 MI, over an area of 2.298 Hectares situated in Village: Raipura Chaklal Khadar, Tehsil – Barhaj, District: Deoria, Uttar Pradesh.Proponent- Shri Krishna Bahadur Rao(Area - 2.29). |
|---|---|
| Status | Environmental approval granted |
| Status since | 4 Jun 2025 |
| Application filed | 27 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shri Krishna Bahadur Rao |
| Land area | 5.7 acres (2.3 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Raipura Chacklal |
| Taluk / tehsil | Barhaj |
| District | Deoria |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03450 |
In context
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Raipura Chacklal, Barhaj, Deoria, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand removal from Bhumidhari/Agricultural land/Private land" at Gata… — lapsed, 1.6 km away
- Improvement & Upgradation of Section of Km 131.500 to Km 176.485 (44.985 Km)… — lapsed, 3.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — more information requested, 15.2 km away
- Proposed Protected Forest Land to Be Diverted for Entry/Exit Approach to Bpcl… — forest land use approved, 15.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — in-principle approval, conditions pending, 15.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 15.5 km away
- Laying of CS Natural Gas pipeline with OFC duct along Gorakhpur Deoria Road… — under forest review, 16.4 km away
- Widening & Strengthening to Two Lane with Paved Shoulder/Four Lane with paved… — more information requested, 16.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.