Quick answers
What is this project?
Improvement & Upgradation of Section of Km 131.500 to Km 176.485 (44.985 Km) to 2-Lane With Paved Shoulder Configuration and Section of Km. 176.485 to Km.188.735 (12.25 Km) to 4-Lane Divided Carriageway of Nh-227a on Ham in the State of Uttar Pradesh is a lapsed road project in Badhia Hardo, Salempur, Deoria, Uttar Pradesh. The site covers 348.4 acres.
Who is building it?
The applicant is Ministry of Road Transport & Highways.
Has it been approved?
No. The application was lapsed on 14 Nov 2023, so it is no longer under consideration.
Where is it?
In Badhia Hardo, Salempur, Deoria, Uttar Pradesh.
How big is it?
It has a stated cost of ₹900 crore; a site of 348.4 acres and 1.6 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 7 Aug 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Improvement & Upgradation of Section of Km 131.500 to Km 176.485 (44.985 Km) to 2-Lane…
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Nov 2023 |
| Application filed | 7 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ministry of Road Transport & Highways |
| Land area | 348.4 acres (141 ha) |
| Forest land | 1.6 acres (0.6 ha) |
| Project cost | ₹900 crore |
| Village / locality | Badhia Hardo |
| Taluk / tehsil | Salempur |
| District | Deoria |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-06367 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Mar 2024 | Forest land use approved | 3.1 acres | ₹900 crore |
| New project filed 7 Aug 2023 (this page) | Lapsed | 348.4 acres | ₹900 crore |
In context
8 applications in Deoria since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Badhia Hardo, Salempur, Deoria, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of riverbed "Ordinary Sand Mining" on the riverbed of… — environmental approval granted, 3.4 km away
- "Ordinary Sand removal from Bhumidhari/Agricultural land/Private land" at Gata… — lapsed, 3.6 km away
- Widening & Strengthening to Two Lane with Paved Shoulder/Four Lane with paved… — more information requested, 15.2 km away
- Improvement & Upgradation of Section of Km 131.500 to Km 176.485 (44.985 Km)… — forest land use approved, 15.8 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — in-principle approval, conditions pending, 16.8 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 16.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — more information requested, 17.2 km away
- Proposed Protected Forest Land to Be Diverted for Entry/Exit Approach to Bpcl… — forest land use approved, 17.2 km away
More from Ministry of Road Transport & Highways in Deoria
- Salempur Bypass to four lane with paved shoulder configuration from Km. 64.000… — more information requested
- Salempur Bypass to four lane with paved shoulder configuration from Km. 64.000… — lapsed
- Deoria Bypass From Existing Km. 27.140 to Existing Km. 46.780 (Design Km.… — more information requested
- Widening & Strengthening to Two Lane with Paved Shoulder/Four Lane with paved… — more information requested
- Rehabilitation & up gradation of Tamkhuiraj – Salempur (NH – 727B) in Deoria… — forest land use approved