Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Mar 2026 |
| Application filed | 27 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mahendra Singh |
| Land area | 4.1 acres (1.7 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Chandgai |
| Taluk / tehsil | Shahjahanpur |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03452 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Sept 2025 (this page) | Environmental approval granted | 4.1 acres | ₹15 lakh |
| New project filed 8 Sept 2025 | Withdrawn | 4.1 acres | ₹10 lakh |
In context
31 applications in Shahjahanpur since January 2022 are in the same category (Mining): 23 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.1 acres, this one is smaller than 77% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Chandgai, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chandgoi Soil Mining Project — withdrawn, 0 m away
- Chandgoi Soil Mining Project — environmental approval granted, 150 m away
- Kutuwapur Soil Mining Project — under environmental review, 1.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL-Mittal… — initial checks, 6.5 km away
- Expansion of existing Sugar unit from 4500 TCD to 6500 TCD and expansion in co… — environmental approval granted, 12 km away
- Expansion of existing Sugar unit from 4500 TCD to 6500 TCD and expansion in co… — cleared for impact study, 12 km away
- New District Jail at Shahjahanpur, Uttar Pradesh (2132 Captive Capacity) — environmental approval granted, 12.1 km away
- Proposed Cane Juice Syrup/B Or C Heavy Molasses/ Grain Based Distillery Having… — environmental approval granted, 12.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.