Project details
| Official title | Establishment of Proposed Cane Juice Syrup/B Or C Heavy Molasses/ Grain Based Distillery Having Capacity – 100 Kld Along With 3.0 MW Co Gen Power at Village: Rausar, Post: Rosa, Tehsil & District: Shahjahanpur, Uttar Pradesh of M/S Avadh Sugar & Energy Limited, Unit: Rosa, Division- Distillery |
|---|---|
| Status | Environmental approval granted |
| Status since | 16 May 2026 |
| Application filed | 29 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Avadh Sugar & Energy Limited |
| Land area | 23 acres (9.3 ha) |
| Project cost | ₹149.3 crore |
| Village / locality | Rausar |
| Taluk / tehsil | Shahjahanpur |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02995 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Nov 2025 (this page) | Environmental approval granted | 23 acres | ₹149.3 crore |
| Early planning filed 17 Feb 2024 | Cleared for impact study | 23 acres | ₹149.3 crore |
In context
29 applications in Shahjahanpur since January 2022 are in the same category (Industry): 25 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 23 acres, this one is smaller than 66% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rausar, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Cane Juice Syrup/B Or C Heavy Molasses/ Grain Based Distillery Having… — cleared for impact study, 0 m away
- Expansion of existing Sugar unit from 4500 TCD to 6500 TCD and expansion in co… — environmental approval granted, 450 m away
- Expansion of existing Sugar unit from 4500 TCD to 6500 TCD and expansion in co… — cleared for impact study, 450 m away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Nayara Energy… — lapsed, 1.5 km away
- Laying of 12" Carbon Steel Gas Pipeline Along the Road by Bpcl on SH-29… — forest land use approved, 3 km away
- Laying of 12" Carbon steel Gas Pipeline along the road by BPCL on… — lapsed, 3 km away
- Nusratpur Soil Mining Project — environmental approval granted, 3.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — in-principle approval, conditions pending, 4.3 km away
More from Avadh Sugar & Energy Limited in Shahjahanpur
- Expansion of existing Sugar unit from 4500 TCD to 6500 TCD and expansion in co… — environmental approval granted
- Expansion of existing Sugar unit from 4500 TCD to 6500 TCD and expansion in co… — cleared for impact study
4 Avadh Sugar & Energy projects in Shahjahanpur
All 7 Avadh Sugar & Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.