Environmental approval grantedIndustry · Shahjahanpur, Uttar Pradesh

Expansion of existing Sugar unit from 4500 TCD to 6500 TCD and expansion in co gen power capacity from 6.5 MW to 9.5 MW within existing industry premises

Expansion of existing Sugar unit from 4500 TCD to 6500 TCD and expansion in co gen power capacity from 6.5 MW to 9.5 MW within existing industry premises is an approved industrial project in Chaunrera Bangar, Shahjahanpur, Uttar Pradesh. The site covers 22.3 acres. Its stated project cost is ₹139 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 23 Sept 2023).

See it on the live map All projects in Shahjahanpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleExpansion of existing Sugar unit from 4500 TCD to 6500 TCD and expansion in co gen power capacity from 6.5 MW to 9.5 MW within existing industry premises at village-Chaudhera, Post: Rosa, District– Shahjahanpur, Uttar Pradesh by M/s Avadh Sugar & Energy Limited, (Unit: Rosa, Division: Sugar)
StatusEnvironmental approval granted
Status since23 Sept 2023
Application filed23 Sept 2023
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantAvadh Sugar & Energy Limited
Land area22.3 acres (9 ha)
Project cost₹139 crore
Village / localityChaunrera Bangar
Taluk / tehsilShahjahanpur
DistrictShahjahanpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00928

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 23 Sept 2023 (this page)Environmental approval granted22.3 acres₹139 crore
Early planning filed 1 Apr 2023Cleared for impact study22.3 acres₹139 crore

In context

29 applications in Shahjahanpur since January 2022 are in the same category (Industry): 25 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 22.3 acres, this one is smaller than 72% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chaunrera Bangar, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Avadh Sugar & Energy Limited in Shahjahanpur

4 Avadh Sugar & Energy projects in Shahjahanpur
All 7 Avadh Sugar & Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.