What is Developing? Open the mapMap

Initial checksMining · Banda, Uttar Pradesh

Proposed riverbed sand/morrum mining project from Ranj River of M/s Victor Mining Pvt. Ltd. Director- Shri Manoj Singh, located at Gata No. - 659, 724 & 805, Village – Barkola Kala, Tehsil - Naraini, District- Banda, U.P., Sanctioned Lease Area- 10.00 ha (24.71 acre)

Proposed riverbed sand/morrum mining project from Ranj River of M/s Victor Mining Pvt. Ltd. Director- Shri Manoj Singh, located at Gata No. - 659, 724 & 805, Village – Barkola Kala, Tehsil - Naraini, District- Banda, U.P., Sanctioned Lease Area- 10.00 ha (24.71 acre) is a proposed mining project in Gopra, Naraini, Banda, Uttar Pradesh. The site covers 24.7 acres. Its stated project cost is ₹88 lakh. As of 27 Nov 2026, its status is “Initial checks” (since 7 Nov 2026).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed riverbed sand/morrum mining project from Ranj River of M/s Victor Mining Pvt. Ltd. Director- Shri Manoj Singh, located at Gata No. - 659, 724 & 805, Village – Barkola Kala, Tehsil - Naraini, District- Banda, U.P., Sanctioned Lease Area- 10.00 ha (24.71 acre) is a proposed mining project in Gopra, Naraini, Banda, Uttar Pradesh. The site covers 24.7 acres.

Who is building it?

The applicant is Suresh Kumar.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Gopra, Naraini, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹88 lakh and a site of 24.7 acres.

When was it filed?

The application was filed on 7 Nov 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed riverbed sand/morrum mining project from Ranj River of M/s Victor Mining Pvt.…

Project details

StatusInitial checks
Status since7 Nov 2026
Application filed7 Nov 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSuresh Kumar
Land area24.7 acres (10 ha)
Project cost₹88 lakh
Village / localityGopra
Taluk / tehsilNaraini
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-07519

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 7 Nov 2026 (this page)Initial checks24.7 acres₹88 lakh
Early planning filed 24 Apr 2026Under environmental review24.7 acres₹88 lakh

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 24.7 acres, this one is smaller than 69% of them.

No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.

Where it is

Gopra, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.