Quick answers
What is this project?
Proposed riverbed sand/morrum mining project from Ranj River of M/s Victor Mining Pvt. Ltd. Director- Shri Manoj Singh, located at Gata No. - 659, 724 & 805, Village – Barkola Kala, Tehsil - Naraini, District- Banda, U.P., Sanctioned Lease Area- 10.00 ha (24.71 acre) is a proposed mining project in Gopra, Naraini, Banda, Uttar Pradesh. The site covers 24.7 acres.
Who is building it?
The applicant is Suresh Kumar.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Gopra, Naraini, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹88 lakh and a site of 24.7 acres.
When was it filed?
The application was filed on 7 Nov 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed riverbed sand/morrum mining project from Ranj River of M/s Victor Mining Pvt.…
Project details
| Status | Initial checks |
|---|---|
| Status since | 7 Nov 2026 |
| Application filed | 7 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Suresh Kumar |
| Land area | 24.7 acres (10 ha) |
| Project cost | ₹88 lakh |
| Village / locality | Gopra |
| Taluk / tehsil | Naraini |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07519 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Nov 2026 (this page) | Initial checks | 24.7 acres | ₹88 lakh |
| Early planning filed 24 Apr 2026 | Under environmental review | 24.7 acres | ₹88 lakh |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 24.7 acres, this one is smaller than 69% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Gopra, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed riverbed sand/morrum mining project from Ranj River of M/s Victor… — under environmental review, 0 m away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Gata… — environmental approval granted, 1.6 km away
- "Sand/Morrum Mining" from Riverbed of Baghein River — environmental approval granted, 1.6 km away
- Sand/Morrum Mining Project at Gata 420, 530/2, 532, 709, and 716, 6.93… — more information requested, 1.9 km away
- Sand/Morrum Mining Project at Gata 420, 530/2, 532, 709, and 716, 6.93… — cleared for impact study, 1.9 km away
- Environmental clearance for sand/morrum mining from riverbed of Baghain, at… — environmental approval granted, 2.7 km away
- Sand/Moram Mining Project — returned to applicant, 2.7 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.