What is Developing? Open the mapMap

Cleared for impact studyMining · Saharanpur, Uttar Pradesh

"Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 (Total area 15.7000 Ha.)

"Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 (Total area 15.7000 Ha.) is a proposed mining project in Mahmoodpur Nagli Aht, Behat, Saharanpur, Uttar Pradesh. The site covers 38.8 acres. Its stated project cost is ₹90 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Jan 2026).

See it on the live map All projects in Saharanpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 (Total area 15.7000 Ha.) is a proposed mining project in Mahmoodpur Nagli Aht, Behat, Saharanpur, Uttar Pradesh. The site covers 38.8 acres.

Who is building it?

The applicant is Rakesh Kumar.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 Jan 2026), as of 27 Nov 2026.

Where is it?

In Mahmoodpur Nagli Aht, Behat, Saharanpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹90 lakh and a site of 38.8 acres.

When was it filed?

The application was filed on 13 Sept 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 (Total area 15.7000 Ha.)

Project details

Official title"Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 (Total area 15.7000 Ha.) located in village – Mahmoodpur Nagli Aehatmal, Tehsil – Behat & District - Saharanpur, Uttar Pradesh, M/s Maa Vaishno Traders, Proprietor-Rakesh Kumar
StatusCleared for impact study
Status since17 Jan 2026
Application filed13 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRakesh Kumar
Land area38.8 acres (15.7 ha)
Project cost₹90 lakh
Village / localityMahmoodpur Nagli Aht
Taluk / tehsilBehat
DistrictSaharanpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03594

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 16 Apr 2026Environmental approval granted38.8 acres₹90 lakh
Early planning filed 13 Sept 2025 (this page)Cleared for impact study38.8 acres₹90 lakh

In context

43 applications in Saharanpur since January 2022 are in the same category (Mining): 34 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 38.8 acres, this one is smaller than 56% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 96.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.

Where it is

Mahmoodpur Nagli Aht, Behat, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.