What is Developing? Open the mapMap

Environmental approval grantedMining · Saharanpur, Uttar Pradesh

Proposed "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 व 1, (Total area 13.8000 Ha.)

Proposed "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 व 1, (Total area 13.8000 Ha.) is an approved mining project in Arazi Zevari Aht, Behat, Saharanpur, Uttar Pradesh. The site covers 34.1 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 17 Jul 2026).

See it on the live map All projects in Saharanpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 व 1, (Total area 13.8000 Ha.) is an approved mining project in Arazi Zevari Aht, Behat, Saharanpur, Uttar Pradesh. The site covers 34.1 acres.

Who is building it?

The applicant is Amit Sharma.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 17 Jul 2026), as of 27 Nov 2026.

Where is it?

In Arazi Zevari Aht, Behat, Saharanpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1 crore and a site of 34.1 acres.

When was it filed?

The application was filed on 18 Apr 2026.

Project details

Official titleproposed "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 व 1, (Total area 13.8000 Ha.) located in village – Arazi Jevadi Ahatmal And Masoodpur Garh Aehatmal , Tehsil – Behat & District - Saharanpur, Uttar Pradesh,Area – 13.8000 Hectares .
StatusEnvironmental approval granted
Status since17 Jul 2026
Application filed18 Apr 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantAmit Sharma
Land area34.1 acres (13.8 ha)
Project cost₹1 crore
Village / localityArazi Zevari Aht
Taluk / tehsilBehat
DistrictSaharanpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04161

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 18 Apr 2026 (this page)Environmental approval granted34.1 acres₹1 crore
Early planning filed 19 Sept 2025Cleared for impact study34.1 acres₹1 crore

In context

43 applications in Saharanpur since January 2022 are in the same category (Mining): 34 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 34.1 acres, this one is smaller than 70% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 72.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 12 mining leases have applied within 5 km.

Where it is

Arazi Zevari Aht, Behat, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.