Quick answers
What is this project?
"Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 (Total area 15.7000 Ha.) is an approved mining project in Mahmoodpur Nagli Aht, Behat, Saharanpur, Uttar Pradesh. The site covers 38.8 acres.
Who is building it?
The applicant is Rakesh Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 17 Jul 2026), as of 27 Nov 2026.
Where is it?
In Mahmoodpur Nagli Aht, Behat, Saharanpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 38.8 acres.
When was it filed?
The application was filed on 16 Apr 2026.
Project details
| Official title | "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 (Total area 15.7000 Ha.) located in village – Mahmoodpur Nagli Aehatmal, Tehsil – Behat & District - Saharanpur, Uttar Pradesh, M/s Maa Vaishno Traders, Proprietor-Rakesh Kumar |
|---|---|
| Status | Environmental approval granted |
| Status since | 17 Jul 2026 |
| Application filed | 16 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rakesh Kumar |
| Land area | 38.8 acres (15.7 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Mahmoodpur Nagli Aht |
| Taluk / tehsil | Behat |
| District | Saharanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04128 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Apr 2026 (this page) | Environmental approval granted | 38.8 acres | ₹90 lakh |
| Early planning filed 13 Sept 2025 | Cleared for impact study | 38.8 acres | ₹90 lakh |
In context
43 applications in Saharanpur since January 2022 are in the same category (Mining): 34 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 38.8 acres, this one is smaller than 56% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 96.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Mahmoodpur Nagli Aht, Behat, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 (Total area 15.7000… — cleared for impact study, 0 m away
- Proposed project "Sand/ Bajri/ Boulder (RBM) Excavation Project" at Gata No.–… — environmental approval granted, 400 m away
- Proposed project "Sand/ Bajri/ Boulder (RBM) Excavation Project" at Gata No.–… — cleared for impact study, 400 m away
- Proposed "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 व 1, (Total… — environmental approval granted, 450 m away
- Proposed "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1 व 1, (Total… — cleared for impact study, 450 m away
- Proposed "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1/1, (Total… — environmental approval granted, 850 m away
- Proposed "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1/1, (Total… — cleared for impact study, 850 m away
- "Sand/Bajri/Boulder (RBM) Mining" from Riverbed of Yamuna River — more information requested, 950 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.