What is this project?
Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD is a proposed industrial project in Milak, Tanda, Rampur, Uttar Pradesh. The site covers 56.6 acres.
Who is building it?
The applicant is Triveni Engineering & Industries Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 2 Sept 2023), as of 27 Nov 2026.
Where is it?
In Milak, Tanda, Rampur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹4.8 crore and a site of 56.6 acres.
When was it filed?
The application was filed on 2 Sept 2023.
Project details
| Official title | Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD along with expansion of existing co gen power capacity from 10 MW to 18 MW within existing industry premises at village-Milak Narayanpur, Tehsil- Tanda, District– Rampur, Uttar Pradesh by M/s Triveni Engineering & Industries Limited, (Unit: Milak Narayanpur, Division: Sugar) |
|---|---|
| Status | Cleared for impact study |
| Status since | 2 Sept 2023 |
| Application filed | 2 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Triveni Engineering & Industries Limited |
| Land area | 56.6 acres (22.9 ha) |
| Project cost | ₹4.8 crore |
| Village / locality | Milak |
| Taluk / tehsil | Tanda |
| District | Rampur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01125 |
In context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Milak, Tanda, Rampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD — environmental approval granted, 0 m away
- Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 900 m away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — forest land use approved, 950 m away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — lapsed, 1.6 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Bharat… — lapsed, 3.6 km away
- "Ordinary Sand Mining" Project — environmental approval granted, 5.3 km away
- Ordinary Sand Mine — environmental approval granted, 5.3 km away
- "Ordinary Sand (Category-II) Mining" from Riverbed of Kosi River — environmental approval granted, 5.4 km away
More from Triveni Engineering & Industries Limited in Rampur
- Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD — environmental approval granted
All 14 Triveni Engineering and projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.