What is Developing? Open the mapMap

Forest land use approvedFuel stations · Rampur, Uttar Pradesh

Proposed Protected Forest Land to be Diverted for Entry/Exit approach to Nayara Energy Limited Retail Outlet

Proposed Protected Forest Land to be Diverted for Entry/Exit approach to Nayara Energy Limited Retail Outlet is an approved fuel station in Muwana, Tanda, Rampur, Uttar Pradesh. The site covers 1 acre. Its stated project cost is ₹65 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 10 Jun 2026).

See it on the live map All projects in Rampur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Protected Forest Land to be Diverted for Entry/Exit approach to Nayara Energy Limited Retail Outlet is an approved fuel station in Muwana, Tanda, Rampur, Uttar Pradesh. The site covers 1 acre.

Who is building it?

The applicant is M/S Nayara Energy Limited.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 10 Jun 2026), as of 27 Nov 2026.

Where is it?

In Muwana, Tanda, Rampur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹65 lakh; a site of 1 acre and 2,040 m² of forest land.

When was it filed?

The application was filed on 20 Mar 2025.

Project details

Official titleProposed Protected Forest Land to be Diverted for Entry/Exit approach to Nayara Energy Limited Retail Outlet at Village:-Muwana, Tehsil:-Tanda & District:-Rampur (Uttar Pradesh).
StatusForest land use approved
Status since10 Jun 2026
Application filed20 Mar 2025
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantM/S Nayara Energy Limited
Land area1 acres (0.4 ha)
Forest land2,040 m²
Project cost₹65 lakh
Village / localityMuwana
Taluk / tehsilTanda
DistrictRampur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06007

In context

30 applications in Rampur since January 2022 are in the same category (Fuel stations): 21 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 1 acre, this one is larger than 87% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Muwana, Tanda, Rampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 61 Nayara Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.