Quick answers
What is this project?
Proposed Protected Forest Land to be Diverted for Entry/Exit approach to Nayara Energy Limited Retail Outlet is an approved fuel station in Muwana, Tanda, Rampur, Uttar Pradesh. The site covers 1 acre.
Who is building it?
The applicant is M/S Nayara Energy Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 10 Jun 2026), as of 27 Nov 2026.
Where is it?
In Muwana, Tanda, Rampur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh; a site of 1 acre and 2,040 m² of forest land.
When was it filed?
The application was filed on 20 Mar 2025.
Project details
| Official title | Proposed Protected Forest Land to be Diverted for Entry/Exit approach to Nayara Energy Limited Retail Outlet at Village:-Muwana, Tehsil:-Tanda & District:-Rampur (Uttar Pradesh). |
|---|---|
| Status | Forest land use approved |
| Status since | 10 Jun 2026 |
| Application filed | 20 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | M/S Nayara Energy Limited |
| Land area | 1 acres (0.4 ha) |
| Forest land | 2,040 m² |
| Project cost | ₹65 lakh |
| Village / locality | Muwana |
| Taluk / tehsil | Tanda |
| District | Rampur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06007 |
In context
30 applications in Rampur since January 2022 are in the same category (Fuel stations): 21 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 1 acre, this one is larger than 87% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Muwana, Tanda, Rampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD — environmental approval granted, 950 m away
- Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD — cleared for impact study, 950 m away
- Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 1.1 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — lapsed, 1.9 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Bharat… — lapsed, 3.3 km away
- Ordinary Sand Mine — environmental approval granted, 5 km away
- "Ordinary Sand Mining" Project — environmental approval granted, 5 km away
- "Ordinary Sand (Category-II) Mining" from Riverbed of Kosi River — environmental approval granted, 5.1 km away
All 61 Nayara Energy projects across India