Quick answers
What is this project?
"Sand / Morrum Mining" from Riverbed of Ken River Village- Khairai, Gata No.- 2/1, 2/2, 2/4, lease area- 5.80 ha., Tehsil- Pailani, District- Banda, Uttar Pradesh, Project Proponent- M/s Uday Minerals (Prop.- Shri Umang Sharma) is a proposed mining project in Kharei, Banda, Uttar Pradesh. The site covers 14.3 acres.
Who is building it?
The applicant is Umang Sharma.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Oct 2025), as of 27 Nov 2026.
Where is it?
In Kharei, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.9 crore and a site of 14.3 acres.
When was it filed?
The application was filed on 26 May 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand / Morrum Mining" from Riverbed of Ken River Village- Khairai, Gata No.- 2/1, 2/2,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Oct 2025 |
| Application filed | 26 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Umang Sharma |
| Land area | 14.3 acres (5.8 ha) |
| Project cost | ₹1.9 crore |
| Village / locality | Kharei |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03763 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Jun 2026 | Environmental approval granted | 14.3 acres | ₹1.9 crore |
| Early planning filed 26 May 2025 (this page) | Cleared for impact study | 14.3 acres | ₹1.9 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 14.3 acres, this one is smaller than 80% of them.
No other mining lease on record is within 500 m of this site; 18 have applied within 5 km.
Where it is
Kharei, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand / Morrum Mining" from Riverbed of Ken River Village- Khairai, Gata No.-… — environmental approval granted, 0 m away
- Sand/Morrum Mining at Ken River Bed, Gata no.-04, Village- Sandikhadar, Tehsil… — environmental approval granted, 850 m away
- Sand/Morrum Mining at Ken River Bed, Gata no.-04, Village- Sandikhadar, Tehsil… — cleared for impact study, 850 m away
- Sadi Khadar Sand/Morrum Mining Project, Located on river bed of Ken River… — under environmental review, 850 m away
- Sadi Khadar Sand/Morrum Mining Project, Located on river bed of Ken River… — under environmental review, 850 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Ken River… — more information requested, 1.2 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Ken River… — cleared for impact study, 1.2 km away
- Transfer of EC Riverbed Sand/Morrum mining project on River Ken located at… — environmental approval granted, 1.9 km away
More from Umang Sharma in Banda
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Marauli khadar, Gata… — under environmental review
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Marauli khadar, Gata… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.