Quick answers
What is "Ordinary Sand Mine" from riverbed of Ghaghra?
"Ordinary Sand Mine" from riverbed of Ghaghra is a proposed mining project in Arazi Duhi Chetan, Harraiya, Basti, Uttar Pradesh. The site covers 440.1 acres.
Who is building it?
The applicant is Aditya Kumar Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 May 2025), as of 27 Nov 2026.
Where is it?
In Arazi Duhi Chetan, Harraiya, Basti, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2.6 crore and a site of 440.1 acres.
When was it filed?
The application was filed on 16 Feb 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Ordinary Sand Mine" from riverbed of Ghaghra
Project details
| Official title | "Ordinary Sand Mine" from riverbed of Ghaghra at Village- Araji doohi Munsiney Poore Chetan, Gata No.- 02 Mi, Lease Area- 10.0 Ha., Tehsil- Harraiya, District- Basti, Uttar Pradesh, Project Proponent- Shri Aditya Kumar Singh S/o Shri Ashok Kumar Singh |
|---|---|
| Status | Cleared for impact study |
| Status since | 19 May 2025 |
| Application filed | 16 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Aditya Kumar Singh |
| Land area | 440.1 acres (178.1 ha) |
| Project cost | ₹2.6 crore |
| Village / locality | Arazi Duhi Chetan |
| Taluk / tehsil | Harraiya |
| District | Basti |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03684 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Oct 2025 | Environmental approval granted | 440.1 acres | ₹2.6 crore |
| Early planning filed 16 Feb 2025 (this page) | Cleared for impact study | 440.1 acres | ₹2.6 crore |
In context
18 applications in Basti since January 2022 are in the same category (Mining): 16 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 440.1 acres, this one is larger than 89% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Arazi Duhi Chetan, Harraiya, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mine" from riverbed of Ghaghra — environmental approval granted, 0 m away
- Improvement and up-gradation of newly declared National Highways NH-227B (84… — forest land use approved, 8.6 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 10 km away
- Diversion of protected forest land for Construction of approach road to the… — lapsed, 10.6 km away
- Ordinary Sand Mining Project — environmental approval granted, 11.1 km away
- Ordinary Sand Mine from the riverbed of Ghaghra river by Shri Sahebdeen Yadav — environmental approval granted, 11.4 km away
- Proposed "Ordinary Sand" Mining Project at Gata No.- 11Kh Mi, 12 Mi, 13 Mi,… — environmental approval granted, 11.4 km away
- 4/6 Lane Ayodhya Bypass Total Length of 67.572 Kms ( Package 1 Northern… — under forest review, 18.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.