What is this project?
Diversion of protected forest land for Construction of approach road to the retail outlet of Hindustan Petroleum Corporation Limited located on Lucknow-Gorakhpur Road, NH-27 (Old NH-28) km. 148 (Chainage- 147.265, R.H.S.) at Khasra No. 623, Village- Khatamsarai, Tehsil- Harraiya, District- Basti (Uttar Pradesh) is a lapsed fuel station in Khatam Sarai, Harraiya, Basti, Uttar Pradesh. The site covers 3.1 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
No. The application was lapsed on 10 Jul 2026, so it is no longer under consideration.
Where is it?
In Khatam Sarai, Harraiya, Basti, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.8 crore; a site of 3.1 acres and 2.8 acres (1.1 ha) of forest land.
When was it filed?
The application was filed on 6 Jun 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 10 Jul 2026 |
| Application filed | 6 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 3.1 acres (1.3 ha) |
| Forest land | 2.8 acres (1.1 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Khatam Sarai |
| Taluk / tehsil | Harraiya |
| District | Basti |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06354 |
In context
15 applications in Basti since January 2022 are in the same category (Fuel stations): 8 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 3.1 acres, this one is larger than 87% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khatam Sarai, Harraiya, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 700 m away
- Improvement and up-gradation of newly declared National Highways NH-227B (84… — forest land use approved, 9 km away
- "Ordinary Sand Mine" from riverbed of Ghaghra — environmental approval granted, 10.6 km away
- "Ordinary Sand Mine" from riverbed of Ghaghra — cleared for impact study, 10.6 km away
- Ordinary Soil Mine Project — environmental approval granted, 11.9 km away
- 4/6 Lane Ayodhya Bypass Total Length of 67.572 Kms ( Package 1 Northern… — under forest review, 15.7 km away
- Ordinary Sand Mining Project — environmental approval granted, 20.7 km away
- Ordinary Sand Mine from the riverbed of Ghaghra river by Shri Sahebdeen Yadav — environmental approval granted, 21.7 km away
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.