Quick answers
What is this project?
Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet is an approved fuel station in Gauriya Nain, Harraiya, Basti, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 11 Mar 2025), as of 27 Nov 2026.
Where is it?
In Gauriya Nain, Harraiya, Basti, Uttar Pradesh.
How big is it?
It has a stated cost of ₹55 lakh; a site of 0.8 acres and 1,540 m² of forest land.
When was it filed?
The application was filed on 15 Oct 2024.
Project details
| Official title | Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet at Village:- Gauriyanain & Khasra No. 246 in Village:- Tikariya, Tehsil:- Harraiya, District:- Basti. |
|---|---|
| Status | Forest land use approved |
| Status since | 11 Mar 2025 |
| Application filed | 15 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 3,300 m² |
| Forest land | 1,540 m² |
| Project cost | ₹55 lakh |
| Village / locality | Gauriya Nain |
| Taluk / tehsil | Harraiya |
| District | Basti |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06664 |
In context
15 applications in Basti since January 2022 are in the same category (Fuel stations): 8 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.8 acres, this one is smaller than 87% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gauriya Nain, Harraiya, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of protected forest land for Construction of approach road to the… — lapsed, 700 m away
- Improvement and up-gradation of newly declared National Highways NH-227B (84… — forest land use approved, 8.4 km away
- "Ordinary Sand Mine" from riverbed of Ghaghra — environmental approval granted, 10 km away
- "Ordinary Sand Mine" from riverbed of Ghaghra — cleared for impact study, 10 km away
- Ordinary Soil Mine Project — environmental approval granted, 12.4 km away
- 4/6 Lane Ayodhya Bypass Total Length of 67.572 Kms ( Package 1 Northern… — under forest review, 16.1 km away
- Ordinary Sand Mining Project — environmental approval granted, 20 km away
- Ordinary Sand Mine from the riverbed of Ghaghra river by Shri Sahebdeen Yadav — environmental approval granted, 21.1 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Basti
- Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail… — under forest review
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — lapsed
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved
6 Bharat Petroleum Corporation (BPCL) projects in Basti
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.