What is this project?
Building Stone As (Khanda, Gitty, Boulder) Mining Project at Gata No. 1164, Area- 1.518 Ha., Village: Kahra, Tehsil: Mahoba, Dist: Mahoba (U.P.), M/S Pathak Granite Proprietor – Shri Pradeep Kumar Pathak is a proposed mining project in Kahra, Mahoba, Uttar Pradesh. The site covers 3.8 acres.
Who is building it?
The applicant is Pradeep Kumar Pathak.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Kahra, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 3.8 acres.
When was it filed?
The application was filed on 4 Feb 2025.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 10 May 2025 |
| Application filed | 4 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pradeep Kumar Pathak |
| Land area | 3.8 acres (1.5 ha) |
| Project cost | ₹1 crore |
| Village / locality | Kahra |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03702 |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.8 acres, this one is larger than 63% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Kahra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- existing Project of "Building Stone as (Khanda, Gitty, Boulder) Mining… — environmental approval granted, 0 m away
- Laying of Carbon Steel Gas Pipe Line (300mm) — under forest review, 6.3 km away
- Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 6.3 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 6.3 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 6.3 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 6.3 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 7.9 km away
- Protected Forest Land proposed to be diverted for the Widening of the Existing… — under forest review, 8.1 km away
More from Pradeep Kumar Pathak in Mahoba
- existing Project of "Building Stone as (Khanda, Gitty, Boulder) Mining… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.