Quick answers
What is Laying of Carbon Steel Gas Pipe Line (300mm)?
Laying of Carbon Steel Gas Pipe Line (300mm) is a proposed road project in Barbai Pahar, Mahoba, Uttar Pradesh. The site covers 1 acre.
Who is building it?
The applicant is Indraprastha Gas Limited New Delhi.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Barbai Pahar, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹86 lakh; a site of 1 acre and 1.7 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 25 Dec 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Laying of Carbon Steel Gas Pipe Line (300mm)
Project details
| Official title | Laying of Carbon Steel Gas Pipe Line (300mm) along with road on Kanpur-Sagar Marg (NH-86, New NH 34) from Km. 106.100 to Km. 120.250 (On R.H.S.), Total Km. 14.150 & 0.7075Ha. In Forest Division/ Social Forestry Division Mahoba, District-Mahoba (UP) |
|---|---|
| Status | Under forest review |
| Status since | 25 Nov 2026 |
| Application filed | 25 Dec 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Indraprastha Gas Limited New Delhi |
| Land area | 3,900 m² |
| Forest land | 1.7 acres (0.7 ha) |
| Project cost | ₹86 lakh |
| Village / locality | Barbai Pahar |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05099 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 25 Dec 2025 (this page) | Under forest review | 1 acre | ₹86 lakh |
| Change of use filed 27 Nov 2025 | Forest land use approved | 0.9 acres | ₹45 lakh |
In context
12 applications in Mahoba since January 2022 are in the same category (Roads & highways): 4 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. At 1 acre, this one is smaller than 91% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barbai Pahar, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 0 m away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 0 m away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 0 m away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 0 m away
- existing Project of "Building Stone as (Khanda, Gitty, Boulder) Mining… — environmental approval granted, 6.3 km away
- Building Stone As (Khanda, Gitty, Boulder) Mining Project at Gata No. 1164,… — returned to applicant, 6.3 km away
- Laying of Carbon Steel Gas Pipe Line (300mm) — forest land use approved, 10.2 km away
- "Building stone (Khanda, Gitti, Boulders)" Project at Gata No.-482, Village-… — environmental approval granted, 12.8 km away
More from Indraprastha Gas Limited New Delhi in Mahoba
- Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — forest land use approved
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
10 Indraprastha Gas Limited projects in Mahoba
All 35 Indraprastha Gas Limited projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.