Quick answers
What is this project?
Protected Forest Land proposed to be diverted for the Widening of the Existing 2-Lane with Paved Shoulders (2L+PS) to 6-Lane of the Kabrai–Banda Section of National Highway-35 (Old NH-76), from Km. 2+900 to Km. 13+600 is a proposed road project in Baghwakhor, Mahoba, Uttar Pradesh. The site covers 163.7 acres.
Who is building it?
The applicant is National Highway Division, P.W.D., Banda.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Baghwakhor, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹16 crore; a site of 163.7 acres and 56.8 acres (23 ha) of forest land.
When was it filed?
The application was filed on 19 Nov 2026.
Project details
| Official title | Protected Forest Land proposed to be diverted for the Widening of the Existing 2-Lane with Paved Shoulders (2L+PS) to 6-Lane of the Kabrai–Banda Section of National Highway-35 (Old NH-76), from Km. 2+900 to Km. 13+600, in District Mahoba, Uttar Pradesh. |
|---|---|
| Status | Under forest review |
| Status since | 19 Nov 2026 |
| Application filed | 19 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highway Division, P.W.D., Banda |
| Land area | 163.7 acres (66.3 ha) |
| Forest land | 56.8 acres (23 ha) |
| Project cost | ₹16 crore |
| Village / locality | Baghwakhor |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07568 |
In context
12 applications in Mahoba since January 2022 are in the same category (Roads & highways): 4 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. At 163.7 acres, this one is larger than 82% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baghwakhor, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 300 m away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — forest land use approved, 1.7 km away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project… — environmental approval granted, 5.2 km away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project… — cleared for impact study, 5.2 km away
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.-512, Khand-01… — lapsed, 5.2 km away
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.-512, Khand-01… — cleared for impact study, 5.2 km away
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.- 512 Khand-03… — lapsed, 5.3 km away
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.- 512 Khand-03… — cleared for impact study, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.