Quick answers
What is this project?
"Sand/Morrum Mining" from Riverbed of Ken River Village- Marauli khadar, Gata No.- Part of 333/7 (Khand No.- 02), lease area- 22.00 Ha. (54.36 Acres), Tehsil- Banda, District- Banda, Uttar Pradesh, Project Proponent- M/s Uday Minerals (Prop. Shri Umang Sharma) is a proposed mining project in Marauli, Banda, Uttar Pradesh. The site covers 54.4 acres.
Who is building it?
The applicant is Umang Sharma.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Jul 2026), as of 27 Nov 2026.
Where is it?
In Marauli, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 54.4 acres.
When was it filed?
The application was filed on 26 Dec 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Jul 2026 |
| Application filed | 26 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Umang Sharma |
| Land area | 54.4 acres (22 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Marauli |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02862 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Sept 2026 | Under environmental review | 54.4 acres | ₹1.3 crore |
| Early planning filed 26 Dec 2025 (this page) | Cleared for impact study | 54.4 acres | ₹1.3 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 54.4 acres, this one is larger than 81% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 253.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Marauli, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Marauli khadar, Gata… — under environmental review, 0 m away
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Maraulikhadar, Gata… — under environmental review, 350 m away
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Maraulikhadar, Gata… — cleared for impact study, 350 m away
- Rivedbed Sand/Morrum Mining from Ken Riverbed in Gata No. 333/7 part, 418,… — lapsed, 350 m away
- Proposed project of Sand/Morrum Mining project of Ken River located at Gata… — under environmental review, 500 m away
- Sand/Morrum Mining Project — environmental approval granted, 500 m away
- Sand/Morrum Mine in Village – Maraulikhader , Tehsil- Banda, District- Banda… — cleared for impact study, 600 m away
- Sand/Morrum Mine in Village – Maraulikhader , Tehsil- Banda, District- Banda… — environmental approval granted, 650 m away
More from Umang Sharma in Banda
- "Sand / Morrum Mining" from Riverbed of Ken River Village- Khairai, Gata No.-… — environmental approval granted
- "Sand / Morrum Mining" from Riverbed of Ken River Village- Khairai, Gata No.-… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.