Cleared for impact studyMining · Mahoba, Uttar Pradesh

"Granite and Dolostone Ballast Gitti Mining Project" at Gata No./Khand: 979 (Khand- 03 Naya) (Total area 2.429 Ha.)

"Granite and Dolostone Ballast Gitti Mining Project" at Gata No./Khand: 979 (Khand- 03 Naya) (Total area 2.429 Ha.) is a proposed mining project in Gahra, Mahoba, Uttar Pradesh. The site covers 6 acres. Its stated project cost is ₹90 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 28 Sept 2026).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Granite and Dolostone Ballast Gitti Mining Project" at Gata No./Khand: 979 (Khand- 03 Naya) (Total area 2.429 Ha.) is a proposed mining project in Gahra, Mahoba, Uttar Pradesh. The site covers 6 acres.

Who is building it?

The applicant is Mradul Dixit.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 28 Sept 2026), as of 27 Nov 2026.

Where is it?

In Gahra, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹90 lakh and a site of 6 acres.

When was it filed?

The application was filed on 18 Jul 2026.

Project details

Official title"Granite and Dolostone Ballast Gitti Mining Project" at Gata No./Khand: 979 (Khand- 03 Naya) (Total area 2.429 Ha.) located in village – Gahra, Tehsil – Mahoba & District - Mahoba, Uttar Pradesh. M/s Shankar Infratech Prop. Shri Mradul Dixit
StatusCleared for impact study
Status since28 Sept 2026
Application filed18 Jul 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantMradul Dixit
Land area6 acres (2.4 ha)
Project cost₹90 lakh
Village / localityGahra
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04816

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6 acres, this one is larger than 88% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 20.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 34 mining leases have applied within 5 km.

Where it is

Gahra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.