Quick answers
What is this project?
Sand/Morrum Mine from Riverbed of Dhasan River, Village- Lidhaura, Gata No.- 1118 Khand No.- 01, lease area- 18.00 Ha, Tehsil- Rath, District- Hamirpur, Uttar Pradesh, Project Proponent- M/s Jay Shri Mahakal Construction (Partner- Smt Shyama Devi W/o Shri Chandan Singh) is an approved mining project in Lidhaura, Rath, Hamirpur, Uttar Pradesh. The site covers 44.5 acres.
Who is building it?
The applicant is Jay Shri Mahakal Construction.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Feb 2026), as of 27 Nov 2026.
Where is it?
In Lidhaura, Rath, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2.6 crore and a site of 44.5 acres.
When was it filed?
The application was filed on 7 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Feb 2026 |
| Application filed | 7 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jay Shri Mahakal Construction |
| Land area | 44.5 acres (18 ha) |
| Project cost | ₹2.6 crore |
| Village / locality | Lidhaura |
| Taluk / tehsil | Rath |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03814 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Oct 2025 (this page) | Environmental approval granted | 44.5 acres | ₹2.6 crore |
| Early planning filed 16 Apr 2025 | Cleared for impact study | 44.5 acres | ₹2.6 crore |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 44.5 acres, this one is smaller than 58% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Lidhaura, Rath, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mine from Riverbed of Dhasan River, Village- Lidhaura, Gata No.-… — cleared for impact study, 0 m away
- "Sand/Morrum Mine" from Riverbed of Dhasan River, Village- Lidhaura, Gata No.-… — under environmental review, 1.5 km away
- "Sand/Morrum Mine" from Riverbed of Dhasan River, Village- Lidhaura, Gata No.-… — cleared for impact study, 1.5 km away
- "Morrum Mining" from Riverbed of Dhasan River — under environmental review, 2.5 km away
- "Morrum Mining" from Riverbed of Dhasan River — lapsed, 3.7 km away
- "Morrum Mining" from Riverbed of Dhasan River — under environmental review, 4.2 km away
- Proposed Forest Land To Be Diverted to Uttar Pradesh Tourism Department For… — under forest review, 5.9 km away
- Proposed Project of Sand/Morrum Mining on the riverbed of Dhasan River at… — under environmental review, 15 km away