Quick answers
What is "Morrum Mining" from Riverbed of Dhasan River?
"Morrum Mining" from Riverbed of Dhasan River is a lapsed mining project in Lidhaura, Rath, Hamirpur, Uttar Pradesh. The site covers 40.8 acres.
Who is building it?
The applicant is Rashi Gupta.
Has it been approved?
No. The application was lapsed on 19 Nov 2026, so it is no longer under consideration.
Where is it?
In Lidhaura, Rath, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.8 crore and a site of 40.8 acres.
When was it filed?
The application was filed on 8 Jul 2026.
Project details
| Official title | "Morrum Mining" from Riverbed of Dhasan River at Village- Lidhaura, Gata No.- 1ka, Khand No.- 3, Lease Area- 16.5 ha., Tehsil- Rath, District- Hamirpur, Uttar Pradesh, Project Proponent- Smt Rashi Gupta W/o Shri Puneet Gupta |
|---|---|
| Status | Lapsed |
| Status since | 19 Nov 2026 |
| Application filed | 8 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Rashi Gupta |
| Land area | 40.8 acres (16.5 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Lidhaura |
| Taluk / tehsil | Rath |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04083 |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 40.8 acres, this one is smaller than 66% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Lidhaura, Rath, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Morrum Mining" from Riverbed of Dhasan River — under environmental review, 650 m away
- "Sand/Morrum Mine" from Riverbed of Dhasan River, Village- Lidhaura, Gata No.-… — under environmental review, 2.3 km away
- "Sand/Morrum Mine" from Riverbed of Dhasan River, Village- Lidhaura, Gata No.-… — cleared for impact study, 2.3 km away
- Proposed Forest Land To Be Diverted to Uttar Pradesh Tourism Department For… — under forest review, 2.5 km away
- Sand/Morrum Mine from Riverbed of Dhasan River, Village- Lidhaura, Gata No.-… — environmental approval granted, 3.7 km away
- Sand/Morrum Mine from Riverbed of Dhasan River, Village- Lidhaura, Gata No.-… — cleared for impact study, 3.7 km away
- "Morrum Mining" from Riverbed of Dhasan River — under environmental review, 5.8 km away
- Proposed Project of Sand/Morrum Mining on the riverbed of Dhasan River at… — under environmental review, 11.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.