Quick answers
What is "Morrum Mining" from Riverbed of Dhasan River?
"Morrum Mining" from Riverbed of Dhasan River is a proposed mining project in Malheta Danda, Rath, Hamirpur, Uttar Pradesh. The site covers 16.1 acres.
Who is building it?
The applicant is Gumber Beverages Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Malheta Danda, Rath, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 16.1 acres.
When was it filed?
The application was filed on 6 Jul 2026.
Project details
| Official title | "Morrum Mining" from Riverbed of Dhasan River at Village- Malehata Dariya, Gata No. 38/1 & 33/1, Khand No. 1, Lease Area- 6.50 Ha., Tehsil- Rath, District- Hamirpur, Uttar Pradesh, Project Proponent- Gumber Beverages Private Limited (Director- Shri Vivek Mishra) |
|---|---|
| Status | Under environmental review |
| Status since | 3 Nov 2026 |
| Application filed | 6 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Gumber Beverages Private Limited |
| Land area | 16.1 acres (6.5 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Malheta Danda |
| Taluk / tehsil | Rath |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04772 |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 16.1 acres, this one is smaller than 100% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Malheta Danda, Rath, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mine from Riverbed of Dhasan River, Village- Lidhaura, Gata No.-… — environmental approval granted, 2.5 km away
- Sand/Morrum Mine from Riverbed of Dhasan River, Village- Lidhaura, Gata No.-… — cleared for impact study, 2.5 km away
- "Sand/Morrum Mine" from Riverbed of Dhasan River, Village- Lidhaura, Gata No.-… — under environmental review, 3.7 km away
- "Sand/Morrum Mine" from Riverbed of Dhasan River, Village- Lidhaura, Gata No.-… — cleared for impact study, 3.7 km away
- "Morrum Mining" from Riverbed of Dhasan River — lapsed, 5.8 km away
- "Morrum Mining" from Riverbed of Dhasan River — under environmental review, 6 km away
- Proposed Forest Land To Be Diverted to Uttar Pradesh Tourism Department For… — under forest review, 7.4 km away
- Re-Diversion for Reliance 4g Project for Laying of Optical Fibre Cable (Ofc) — forest land use approved, 14.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.