Environmental approval grantedBuildings & townships · Ayodhya, Uttar Pradesh

Proposed Construction of a 300-Bedded Hospital at District Ayodhya, Uttar Pradesh, India

Proposed Construction of a 300-Bedded Hospital at District Ayodhya, Uttar Pradesh, India is an approved hospital project in Faizabad, Ayodhya, Uttar Pradesh. It plans 300 units in 3 towers of up to 8 floors on 3.2 acres. Its stated project cost is ₹163.7 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 5 Dec 2025).

See it on the live map All projects in Ayodhya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Construction of a 300-Bedded Hospital at District Ayodhya, Uttar Pradesh, India is an approved hospital project in Faizabad, Ayodhya, Uttar Pradesh. It plans 300 units in 3 towers of up to 8 floors on 3.2 acres.

Who is building it?

The applicant is Sushil Kumar.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 5 Dec 2025), as of 27 Nov 2026.

Where is it?

In Faizabad, Ayodhya, Uttar Pradesh.

How big is it?

It has a stated cost of ₹163.7 crore and a site of 3.2 acres.

When was it filed?

The application was filed on 4 Sept 2025.

Project details

StatusEnvironmental approval granted
Status since5 Dec 2025
Application filed4 Sept 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantSushil Kumar
UseHospital
Units300
Towers3
Floors (tallest)8
Basements1
Height34 m
Parking spaces367
Land area3.2 acres (1.3 ha)
Built-up area40,214 m² (4,32,859 sq ft)
Plot area12,798 m² (1,37,756 sq ft)
Project cost₹163.7 crore
Village / localityFaizabad
Taluk / tehsilFaizabad
DistrictAyodhya
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03840

In context

15 applications in Ayodhya since January 2022 are in the same category (Buildings & townships): 11 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.2 acres, this one is smaller than 80% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Faizabad, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.