Quick answers
What is this project?
Proposed "Ordinary Soil Mining Project" at Gata 356 & 420 by Ms Kajal Sharma D/o Shri Rajesh is a proposed mining project in Raja Bhur, Sambhal, Uttar Pradesh. The site covers 8.8 acres.
Who is building it?
The applicant is Kajal.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Raja Bhur, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹37 lakh and a site of 8.8 acres.
When was it filed?
The application was filed on 17 Sept 2026.
Project details
| Official title | Proposed "Ordinary Soil Mining Project" at Gata 356 & 420 in Village-Rajabhood, Tehsil- Sambhal & Distt- Sambhal, Uttar Pradesh. (Lease Area: 3.547 Ha.) by Ms Kajal Sharma D/o Shri Rajesh |
|---|---|
| Status | Under environmental review |
| Status since | 17 Nov 2026 |
| Application filed | 17 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kajal |
| Land area | 8.8 acres (3.6 ha) |
| Project cost | ₹37 lakh |
| Village / locality | Raja Bhur |
| Taluk / tehsil | Sambhal |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03938 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 8.8 acres, this one is larger than 76% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Raja Bhur, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Mining Project" at Gata No.- 256 & 277 — environmental approval granted, 6.8 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 8.7 km away
- Proposed Retail Outlet by Hindustan Petroleum Corp. Ltd. at Km. Ch. 34.483 on… — under forest review, 9.8 km away
- Proposed "Ordinary Soil Excavation" Project Area- 2.248 Ha. at Gata No.– 1581,… — environmental approval granted, 10.3 km away
- "Ordinary Soil Mining" Project at Gata No.- 404, 433, 396, 392, 399, Village-… — environmental approval granted, 12.1 km away
- Proposed "Ordinary Soil Mining Project" at Gata 38, 122, 125, 76, 156, 157,… — under environmental review, 12.7 km away
- "Ordinary Soil Mining" Project at Gata No.- 191, 215, 217, 218, 220, 221, 222,… — initial checks, 13.7 km away
- Mining of Minor Mineral Ordinary Soil — environmental approval granted, 14 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.