What is "Ordinary Soil Mining Project" at Gata No.- 256 & 277?
"Ordinary Soil Mining Project" at Gata No.- 256 & 277 is an approved mining project in Muhammadpur Malni, Sambhal, Uttar Pradesh. The site covers 6.1 acres.
Who is building it?
The applicant is Jitendra Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Mar 2026), as of 27 Nov 2026.
Where is it?
In Muhammadpur Malni, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹23 lakh and a site of 6.1 acres.
When was it filed?
The application was filed on 8 Sept 2025.
Project details
| Official title | "Ordinary Soil Mining Project" at Gata No.- 256 & 277 in Village-Mohammadpur Malni, Tehsil- & District- Sambhal, Uttar Pradesh. (Lease Area: 2.476Ha.) Project Proponent- Shri Jitendra Singh |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Mar 2026 |
| Application filed | 8 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jitendra Singh |
| Land area | 6.1 acres (2.5 ha) |
| Project cost | ₹23 lakh |
| Village / locality | Muhammadpur Malni |
| Taluk / tehsil | Sambhal |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-03114 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6.1 acres, this one is smaller than 55% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Muhammadpur Malni, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 5.8 km away
- Proposed "Ordinary Soil Mining Project" at Gata 356 & 420 by Ms Kajal Sharma… — under environmental review, 6.8 km away
- "Ordinary Soil Excavation Project" at Gata No. 711,714,775,798,781 (Total area… — environmental approval granted, 8.2 km away
- Proposed Protected Forest Land to be diverted for Ex-post Facto Approval… — more information requested, 8.6 km away
- M/S IOCL Ltd Moradabad Protected Land is required to be diverted (FCA 1980 For… — forest land use approved, 8.6 km away
- M/S IOCL Ltd Moradabad Protected Land is required to be diverted (FCA 1980 For… — lapsed, 8.6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 8.6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — forest land use approved, 8.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.