Project details
| Official title | "Ordinary Sand Mining" from Riverbed of Ganga River at Village- Bara, Gata No.- 1255 क, Lease Area- 15.0 ha., Tehsil- Sevrai, District- Ghazipur, Uttar Pradesh, Project Proponent- M/s G D MINING PRIVATE LIMITED/524275 (Director- Manaswita Ghosh) |
|---|---|
| Status | Environmental approval granted |
| Status since | 17 Jul 2026 |
| Application filed | 13 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Gee Dee Mining Private Limited |
| Land area | 37.1 acres (15 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Bara Khas |
| Taluk / tehsil | Zamania |
| District | Ghazipur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03954 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Jan 2026 (this page) | Environmental approval granted | 37.1 acres | ₹1.8 crore |
| Early planning filed 8 Jan 2025 | Cleared for impact study | 37.1 acres | ₹1.8 crore |
In context
9 applications in Ghazipur since January 2022 are in the same category (Mining): 7 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bara Khas, Zamania, Ghazipur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" from Riverbed of Ganga River — cleared for impact study, 0 m away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 13.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 20.5 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — lapsed, 23.4 km away
- Proposed forest land to be diverted for Entry/Exit approach to Reliance BP… — forest land use approved, 26.8 km away
- Riverbed Ordinary Sand mine from Riverbed of Ganga River located at Gata No.… — lapsed, 28.1 km away
- Riverbed Ordinary Sand mine from Riverbed of Ganga River located at Gata No.… — cleared for impact study, 28.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — lapsed, 28.8 km away
All 12 Gee Dee Mining projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.