Project details
| Official title | Proposed "Ordinary Soil Mining Project" at Gata No.- 538Mi & 539Mi in Village- Jura, Tehsil- Hardoi, District- Hardoi, Uttar Pradesh. (Lease Area: 2.450 hectares) by M/s Maa Katyani Enterprises, Proprietor- Shri Ashish Kumar Mishra |
|---|---|
| Status | Under environmental review |
| Status since | 28 Oct 2026 |
| Application filed | 23 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ashish Kumar Mishra |
| Land area | 6.1 acres (2.5 ha) |
| Project cost | ₹24 lakh |
| Village / locality | Jura |
| Taluk / tehsil | Hardoi |
| District | Hardoi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04016 |
In context
22 applications in Hardoi since January 2022 are in the same category (Mining): 11 approved, 11 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6.1 acres, this one is larger than 68% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Jura, Hardoi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 2.4 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — lapsed, 2.6 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — forest land use approved, 4.6 km away
- Diversion of 400 kV Sc Lucknow Bareilly Transmission Line for NH 731… — more information requested, 5.4 km away
- Proposed BPCL Retail Outlet on Hardoi-Sandi Road (ODR) in Km. No. 04 (CH. No.… — lapsed, 5.6 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed, 8.1 km away
- Proposed forest Land to be diverted for Widening & Strengthening of Road — in-principle approval, conditions pending, 8.3 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — in-principle approval, conditions pending, 8.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.