Project details
| Official title | Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy Limited Retail Outlet at Village: -Bausra, Tehsil:- Hardoi, District:- Hardoi |
|---|---|
| Status | Forest land use approved |
| Status since | 12 Mar 2025 |
| Application filed | 28 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | M/S Nayara Energy Limited |
| Land area | 1.2 acres (0.5 ha) |
| Forest land | 1,700 m² |
| Project cost | ₹65 lakh |
| Village / locality | Bausra |
| Taluk / tehsil | Hardoi |
| District | Hardoi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06079 |
In context
22 applications in Hardoi since January 2022 are in the same category (Fuel stations): 13 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 1.2 acres, this one is larger than 73% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bausra, Hardoi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Ordinary Soil Mining Project" at Gata No.- 538Mi & 539Mi — under environmental review, 4.6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 5.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — lapsed, 5.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 6.8 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 8 km away
- Diversion of 400 kV Sc Lucknow Bareilly Transmission Line for NH 731… — more information requested, 9.2 km away
- Proposed BPCL Retail Outlet on Hardoi-Sandi Road (ODR) in Km. No. 04 (CH. No.… — lapsed, 10.2 km away
- "Ordinary Earth Mining Project" at Gata No.- 447, 451, 452, 503, 506 — under environmental review, 10.6 km away
All 61 Nayara Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.