Project details
| Official title | Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet at Village:- Bhadecha, Tehsil:- Hardoi, District:- Hardoi. |
|---|---|
| Status | Lapsed |
| Status since | 17 Jun 2025 |
| Application filed | 28 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 1.2 acres (0.5 ha) |
| Forest land | 3,590 m² |
| Project cost | ₹60 lakh |
| Village / locality | Bnadaicha |
| Taluk / tehsil | Hardoi |
| District | Hardoi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05230 |
In context
22 applications in Hardoi since January 2022 are in the same category (Fuel stations): 13 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 1.2 acres, this one is larger than 77% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bnadaicha, Hardoi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 450 m away
- Proposed "Ordinary Soil Mining Project" at Gata No.- 538Mi & 539Mi — under environmental review, 2.6 km away
- Diversion of 400 kV Sc Lucknow Bareilly Transmission Line for NH 731… — more information requested, 3.5 km away
- Proposed BPCL Retail Outlet on Hardoi-Sandi Road (ODR) in Km. No. 04 (CH. No.… — lapsed, 5.4 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — forest land use approved, 5.7 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed, 5.8 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — in-principle approval, conditions pending, 5.9 km away
- Proposed forest Land to be diverted for Widening & Strengthening of Road — in-principle approval, conditions pending, 6 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Hardoi
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — lapsed
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved
- Proposed BPCL Retail Outlet on Hardoi-Sandi Road (ODR) in Km. No. 04 (CH. No.… — lapsed
6 Bharat Petroleum Corporation (BPCL) projects in Hardoi
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.