Quick answers
What is this project?
Proposed riverbed sand/morrum mining project from Ken River of M/s Neo Crusher Mining Pvt. Ltd. Director- Shri Imran Ahmad S/o Shri Afzal Ahmad, located at Gata No. Part of 5118, 5128, 5129, 5130, 5131, 5132, 5134, 5135, 5136, 5065, 5114/1, 5115, 5116, 5117, 5119, 5120, 5121, 5122, 5123, 5124, 5125, 5126, 5152, Village – Ladakapurwa, Tehsil - Banda, District - Banda, Uttar Pradesh. Sanctioned Lease Area- 20.00 ha, Workable Area- 3.70 ha, Non-workable Area- 16.30ha is a proposed mining project in Bhawani Purwa, Banda, Uttar Pradesh. The site covers 49.4 acres.
Who is building it?
The applicant is Neo Crusher Mining Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Bhawani Purwa, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2.6 crore and a site of 49.4 acres.
When was it filed?
The application was filed on 30 Jul 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 30 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Neo Crusher Mining Private Limited |
| Land area | 49.4 acres (20 ha) |
| Project cost | ₹2.6 crore |
| Village / locality | Bhawani Purwa |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04293 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 49.4 acres, this one is larger than 69% of them.
No other mining lease on record is within 500 m of this site; 11 have applied within 5 km.
Where it is
Bhawani Purwa, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Ken River — more information requested, 1 km away
- River Bed Sand/Morrum Mining having lease area 24.0 ha (59.30 acre) along… — under environmental review, 1.2 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 1.3 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — environmental approval granted, 1.8 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — cleared for impact study, 1.8 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — lapsed, 2 km away
- Integrated Solid Waste Management Plant for 130 TPD at Nagar Palika Parishad,… — environmental approval granted, 2.8 km away
- Integrated Solid Waste Management Plant for 130 TPD at Nagar Palika Parishad,… — cleared for impact study, 2.8 km away
More from Neo Crusher Mining Private Limited in Banda
- Proposed riverbed sand/morrum mining project from Yamuna River of M/s Neo… — environmental approval granted
- Proposed riverbed sand/morrum mining project from Yamuna River of M/s Neo… — cleared for impact study
3 Neo Crusher Mining projects in Banda
All 5 Neo Crusher Mining projects across India