What is Developing? Open the mapMap

Under environmental reviewMining · Banda, Uttar Pradesh

Proposed riverbed sand/morrum mining project from Ken River of M/s Neo Crusher Mining Pvt. Ltd. Director- Shri Imran Ahmad S/o Shri Afzal Ahmad, located at Gata No. Part of 5118, 5128, 5129, 5130, 5131, 5132, 5134, 5135, 5136, 5065, 5114/1, 5115, 5116, 5117, 5119, 5120, 5121, 5122, 5123, 5124, 5125, 5126, 5152, Village – Ladakapurwa, Tehsil - Banda, District - Banda, Uttar Pradesh. Sanctioned Lease Area- 20.00 ha, Workable Area- 3.70 ha, Non-workable Area- 16.30ha

Proposed riverbed sand/morrum mining project from Ken River of M/s Neo Crusher Mining Pvt. Ltd. Director- Shri Imran Ahmad S/o Shri Afzal Ahmad, located at Gata No. Part of 5118, 5128, 5129, 5130, 5131, 5132, 5134, 5135, 5136, 5065, 5114/1, 5115, 5116, 5117, 5119, 5120, 5121, 5122, 5123, 5124, 5125, 5126, 5152, Village – Ladakapurwa, Tehsil - Banda, District - Banda, Uttar Pradesh. Sanctioned Lease Area- 20.00 ha, Workable Area- 3.70 ha, Non-workable Area- 16.30ha is a proposed mining project in Bhawani Purwa, Banda, Uttar Pradesh. The site covers 49.4 acres. Its stated project cost is ₹2.6 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 20 Nov 2026).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed riverbed sand/morrum mining project from Ken River of M/s Neo Crusher Mining Pvt. Ltd. Director- Shri Imran Ahmad S/o Shri Afzal Ahmad, located at Gata No. Part of 5118, 5128, 5129, 5130, 5131, 5132, 5134, 5135, 5136, 5065, 5114/1, 5115, 5116, 5117, 5119, 5120, 5121, 5122, 5123, 5124, 5125, 5126, 5152, Village – Ladakapurwa, Tehsil - Banda, District - Banda, Uttar Pradesh. Sanctioned Lease Area- 20.00 ha, Workable Area- 3.70 ha, Non-workable Area- 16.30ha is a proposed mining project in Bhawani Purwa, Banda, Uttar Pradesh. The site covers 49.4 acres.

Who is building it?

The applicant is Neo Crusher Mining Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Bhawani Purwa, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹2.6 crore and a site of 49.4 acres.

When was it filed?

The application was filed on 30 Jul 2026.

Project details

StatusUnder environmental review
Status since20 Nov 2026
Application filed30 Jul 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantNeo Crusher Mining Private Limited
Land area49.4 acres (20 ha)
Project cost₹2.6 crore
Village / localityBhawani Purwa
Taluk / tehsilBanda
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04293

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 49.4 acres, this one is larger than 69% of them.

No other mining lease on record is within 500 m of this site; 11 have applied within 5 km.

Where it is

Bhawani Purwa, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Neo Crusher Mining Private Limited in Banda

3 Neo Crusher Mining projects in Banda
All 5 Neo Crusher Mining projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.