Quick answers
What is this project?
Proposed Integrated Manufacturing & Logistic Cluster (IMLC) - Hamirpur at Villages - Igui and Dhanouri, Tehsil – Rath, District - Hamirpur, State - Uttar Pradesh by Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) is a proposed industrial project in Igui, Rath, Hamirpur, Uttar Pradesh. The site covers 259 acres.
Who is building it?
The applicant is Uttar Pradesh Expressways Industrial Development Authority (Upeida).
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Igui, Rath, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹175.3 crore and a site of 259 acres.
When was it filed?
The application was filed on 11 Jun 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 13 Oct 2026 |
| Application filed | 11 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Uttar Pradesh Expressways Industrial Development Authority (Upeida) |
| Land area | 259 acres (104.8 ha) |
| Project cost | ₹175.3 crore |
| Village / locality | Igui |
| Taluk / tehsil | Rath |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04573 |
In context
5 applications in Hamirpur since January 2022 are in the same category (Industry): 4 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected.
Where it is
Igui, Rath, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 13.9 km away
- Re-diversion for Reliance 4G Project for Laying of OFC — lapsed, 15.6 km away
- Re-Diversion for Reliance 4g Project for Laying of Optical Fibre Cable (Ofc) — forest land use approved, 18.2 km away
- Morrum Mine — cleared for impact study, 19.6 km away
- Re-Diversion for Reliance 4g Project for Laying of Optical Fibre Cable (Ofc) — lapsed, 22.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — in-principle approval, conditions pending, 22.9 km away
- Re-Diversion for Reliance 4g Project for Laying of Optical Fibre Cable (Ofc) — lapsed, 23.2 km away
- "Morrum Mining" from Riverbed of Dhasan River — under environmental review, 28.9 km away
All 39 Uttar Pradesh Expressways Industrial Development Authority (Upeida) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.