Quick answers
What is this project?
Proposed Forest land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet is a lapsed fuel station in Baswari, Maudaha, Hamirpur, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
No. The application was lapsed on 6 Oct 2025, so it is no longer under consideration.
Where is it?
In Baswari, Maudaha, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹55 lakh; a site of 0.8 acres and 2,150 m² of forest land.
When was it filed?
The application was filed on 7 Jul 2025.
Project details
| Official title | Proposed Forest land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet at Village:-Baswari, Tehsil:- Maudaha, District:- Hamirpur. |
|---|---|
| Status | Lapsed |
| Status since | 6 Oct 2025 |
| Application filed | 7 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 3,400 m² |
| Forest land | 2,150 m² |
| Project cost | ₹55 lakh |
| Village / locality | Baswari |
| Taluk / tehsil | Maudaha |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07168 |
In context
13 applications in Hamirpur since January 2022 are in the same category (Fuel stations): 5 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.8 acres, this one is smaller than 69% of them.
Where it is
Baswari, Maudaha, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-diversion for Reliance 4G Project for Laying of OFC — lapsed, 6.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — in-principle approval, conditions pending, 9.3 km away
- Re-Diversion for Reliance 4g Project for Laying of Optical Fibre Cable (Ofc) — lapsed, 10.2 km away
- Re-Diversion for Reliance 4g Project for Laying of Optical Fibre Cable (Ofc) — lapsed, 11.1 km away
- Proposed Integrated Manufacturing & Logistic Cluster (IMLC) - Hamirpur at… — under environmental review, 13.9 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 18.9 km away
- Morrum Mine — cleared for impact study, 22.1 km away
- Morrum Mining at Betwa River Bed over and area of 7.4050Ha. Khand No.23/2 at… — initial checks, 23.8 km away
More from Indian Oil Corporation Limited (IOCL) in Hamirpur
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — more information requested
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — more information requested
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
7 Indian Oil Corporation (IOCL) projects in Hamirpur
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.