Project details
| Status | Initial checks |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 5 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Usha Devi |
| Land area | 24.7 acres (10 ha) |
| Project cost | ₹89 lakh |
| Village / locality | Kohna Gopalpur |
| Taluk / tehsil | Gola |
| District | Gorakhpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07504 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Nov 2026 (this page) | Initial checks | 24.7 acres | ₹89 lakh |
| Early planning filed 30 Apr 2026 | Under environmental review | 24.7 acres | ₹89 lakh |
In context
13 applications in Gorakhpur since January 2022 are in the same category (Mining): 6 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. At 24.7 acres, this one is larger than 77% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Kohna Gopalpur, Gola, Gorakhpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Ordinary Sand Mining project from the riverbed of Ghaghara river at… — under environmental review, 0 m away
- Riverbed Sand Mining on the riverbed of Ghaghara River at Gata No. 62 Gha,… — under environmental review, 3 km away
- "Riverbed Ordinary Sand mining" from Riverbed of Ghaghara River located at… — environmental approval granted, 3.4 km away
- "Riverbed Ordinary Sand mining" from Riverbed of Ghaghara River located at… — cleared for impact study, 3.4 km away
- PROPOSED GRAIN BASED ETHANOL DISTILLERY CAPACITY – 750 KLD AND MALT BASED… — environmental approval granted, 10.9 km away
- PROPOSED GRAIN BASED ETHANOL DISTILLERY CAPACITY – 750 KLD AND MALT BASED… — cleared for impact study, 10.9 km away
- Proposed Standalone Cement Grinding unit with Cement Production Capacity of 2… — cleared for impact study, 11.1 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — under environmental review, 11.2 km away