Environmental approval grantedIndustry · Mirzapur, Uttar Pradesh

Proposed Stand-alone Grinding Unit with Cement Production Capacity of 5.0 Million TPA (Line I - 2.5 Million TPA and Line II - 2.5 Million TPA) and D.G. Set of 2000 KVA (Line I - 2 x 500 KVA and Line II - 2 x 500 KVA)

Proposed Stand-alone Grinding Unit with Cement Production Capacity of 5.0 Million TPA (Line I - 2.5 Million TPA and Line II - 2.5 Million TPA) and D.G. Set of 2000 KVA (Line I - 2 x 500 KVA and Line II - 2 x 500 KVA) is an approved industrial project in Newada, Lalganj, Mirzapur, Uttar Pradesh. The site covers 34.7 acres. Its stated project cost is ₹765 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 8 May 2023).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Stand-alone Grinding Unit with Cement Production Capacity of 5.0 Million TPA (Line I - 2.5 Million TPA and Line II - 2.5 Million TPA) and D.G. Set of 2000 KVA (Line I - 2 x 500 KVA and Line II - 2 x 500 KVA) is an approved industrial project in Newada, Lalganj, Mirzapur, Uttar Pradesh. The site covers 34.7 acres.

Who is building it?

The applicant is Dalmia Bharat Green Vision Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 8 May 2023), as of 27 Nov 2026.

Where is it?

In Newada, Lalganj, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹765 crore and a site of 34.7 acres.

When was it filed?

The application was filed on 8 May 2023.

Project details

Official titleProposed Stand-alone Grinding Unit with Cement Production Capacity of 5.0 Million TPA (Line I - 2.5 Million TPA and Line II - 2.5 Million TPA) and D.G. Set of 2000 KVA (Line I - 2 x 500 KVA and Line II - 2 x 500 KVA) at Village: Nevada, Tehsil: Lalganj, District: Mirzapur, Uttar Pradesh.
StatusEnvironmental approval granted
Status since8 May 2023
Application filed8 May 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantDalmia Bharat Green Vision Limited
Land area34.7 acres (14.1 ha)
Project cost₹765 crore
Village / localityNewada
Taluk / tehsilLalganj
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01247

In context

16 applications in Mirzapur since January 2022 are in the same category (Industry): 9 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 34.7 acres, this one is larger than 81% of them.

Where it is

Newada, Lalganj, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 14 Dalmia Bharat Green Vision projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.