Proposed Stand-alone Grinding Unit with Cement Production Capacity of 5.0 Million TPA (Line I - 2.5 Million TPA and Line II - 2.5 Million TPA) and D.G. Set of 2000 KVA (Line I - 2 x 500 KVA and Line II - 2 x 500 KVA) is an approved industrial project in Newada, Lalganj, Mirzapur, Uttar Pradesh. The site covers 34.7 acres.
Who is building it?
The applicant is Dalmia Bharat Green Vision Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 May 2023), as of 27 Nov 2026.
Where is it?
In Newada, Lalganj, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹765 crore and a site of 34.7 acres.
When was it filed?
The application was filed on 8 May 2023.
Project details
| Official title | Proposed Stand-alone Grinding Unit with Cement Production Capacity of 5.0 Million TPA (Line I - 2.5 Million TPA and Line II - 2.5 Million TPA) and D.G. Set of 2000 KVA (Line I - 2 x 500 KVA and Line II - 2 x 500 KVA) at Village: Nevada, Tehsil: Lalganj, District: Mirzapur, Uttar Pradesh. |
|---|---|
| Status | Environmental approval granted |
| Status since | 8 May 2023 |
| Application filed | 8 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Dalmia Bharat Green Vision Limited |
| Land area | 34.7 acres (14.1 ha) |
| Project cost | ₹765 crore |
| Village / locality | Newada |
| Taluk / tehsil | Lalganj |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01247 |
In context
16 applications in Mirzapur since January 2022 are in the same category (Industry): 9 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 34.7 acres, this one is larger than 81% of them.
Where it is
Newada, Lalganj, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing 200 Klpd Grain Based Distillery Unit to 400klpd… — returned to applicant, 5.7 km away
- Expansion of existing 200 KLPD Grain Based Distillery Unit to 300 KLPD Ethanol… — returned to applicant, 5.7 km away
- Expansion of Existing 200 Klpd Grain Based Distillery Unit to 400klpd… — lapsed, 5.7 km away
- Proposed project of Building Stone Sand Stone Quartizite Ballast… — environmental approval granted, 5.9 km away
- Kalu Patti Pumped Storage Project — cleared for impact study, 7.7 km away
- Kalu Patti PSP (1000 MW) — under environmental review, 7.9 km away
- Kalu Patti Pumped Storage Project (1000 MW) — lapsed, 7.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 11 km away